NOTE Cover the laying of the special (white) grease. Tighten the 2 screws fastening. 4 Connect the coolant hose. Connect the wiring harness connector coolant temperature sensor. Install pipe cooling system. Tighten the 3 nuts point 9 Nm Attach the 2 coolant hose bracket Install hose air intercooler boost choke on the throttle. Tighten the clamp 2 point 3.5 Nm Replace the cover of the engine. Raise the car completely. Install the bottom cover of the engine compartment. Lower the car completely. Replace the battery pack. Connect the battery pack. Attach the grounding connector to the grounding terminal. Top up the coolant and make sure that it corresponds to the number of normal. Program volatile memory. Close the hood.
2.8. Lubrication Replacing the oil pump (1.4 l) Withdrawal Before the verification procedure warming up the engine to operating temperature (oil temperature 80 ° C). Open the hood. Loosen nuts and disconnect the wire from the massive battery Remove the air filter housing and intake manifold. Disconnect the wiring harness connector sensor mass air flow. Fig. 2.327. Components, shooting in the dismantling of the air filter: 1 attachment bolt, 2 - inlet manifold, 3 - the wiring harness connector sensor mass air flow, 4 - air filter housing
Loosen the mounting bolt, remove the collar and the inlet pipe of air filter.
305