Models 1750RT/2100RT Tier 4 Engine Removal/Installation IMPORTANT: Refer to the labeling for tube positioning (O, Fig. 378) made during engine removal for proper tube installation locations.
37. Attach a lift bracket (X, Fig. 380) to the top of the hydraulic pump, to allow lifting the hydraulic pump using a hoist (Y).
33. Connect tubes (O) to the control valve tighten securely.
NOTE: Lift bracket (X) needs to be fabricated. Threading for mounting bracket holes for lift bracket (X) is M12-1.75.
O X O
Y
Fig. 378 – Control Valve Tubes Fig. 380 – Hydraulic Pump (Early Machines Shown; Later Machines Similar)
34. Secure hose/cable clamp bracket (M, Fig. 379) against the engine block with 3 fasteners removed during engine removal.
38. Lift the hydraulic pump slightly, and pull the pump rearward, meshing the splined driveshaft on the pump into the engine. Pull the pump tight against the engine
35. Secure the battery ground cable to the engine block using screw (N). Tighten securely. 36. Secure hose/cable clamp bracket (O) to the engine block using screws (L). Tighten securely.
NOTE: A come-along hand winch may be required to pull the hydraulic pump rearward against the engine.
O N
L
M
Fig. 379 – Hose/Cable Clamps
Printed in U.S.A.
227
50940164/C0718