Mustang Compact Excavator ME12002 Service Manual_909768 - PDF DOWNLOAD

Page 230

JOHN DEERE ENGINE 4045TF270 (SN AC02633 AND UP)

ME12002

Setting the Opening Pressure

Correcting the Opening Pressure

1. Close the pressure gauge valve of the nozzle tester (A). See Figure 4-45.

NOTICE: Only complete these steps if opening pressure measurements are not within the acceptable range of measurements. See “Setting the Opening Pressure.” A

B

A

Figure 4-45 Testing Opening Pressure C

2. Rapidly actuate the pump to flush the nozzle.

D

3. Rapidly actuate the pump to increase the pressure until the nozzle opens. The gauge quickly drops after the nozzle opens.

Figure 4-46 Setting Opening Pressure

4. Record the opening pressure measurement.

2. Insert the nozzle into positioning clip and secure positioning clip into a vice. See Figure 4-43.

5. Refer to the following table for acceptable fuel injection nozzle RE48786 opening pressure measurements: New or overhauled nozzle w ith new inside parts 3698 – 260 psi O pening pressure for (255 – 260 bar) adjustm ent O pening pressure for Minim um 3568 psi check (246 bar) Used nozzle O pening pressure for check

Minim um 3408 psi (235 bar)

O pening pressure difference am ong cylinders Maxim um pressure difference = 102 psi (7 bar)

6. If measurements are not acceptable, complete the steps in “Correcting the Opening Pressure.”

1. Remove the nozzle from the tester.

3. Remove lift adjusting lock nut (D). See Figure 4-46. 4. Loosen pressure set screw lock nut (A). 5. Remove the nozzle from the positioning clip and vice. 6. Connect the nozzle to the tester, with the nozzle tip facing downward. 7. Unscrew stroke set screw (B) (two or three rotations) until there is no more contact with stroke set screw (B) when turning pressure set screw (C). 8. Screw pressure set screw (C) clockwise (to the right) to increase opening pressure, or unscrew pressure set screw (C) counter-clockwise (to the left) to decrease opening pressure. 9. Check that the opening pressure is at the high limit of the opening pressure measurement. See step 5, of “Setting the Opening Pressure.” 10. Write down the opening pressure measurement. 11. If measurements are not acceptable, repeat steps 1 through 10 of this procedure.

909768/BP1207

222

Printed in U.S.A


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

ME12002TROUBLESHOOTING

1min
page 311

ME12002TROUBLESHOOTING

1min
pages 309-310

JOHNDEEREENGINE4045TF270(SNAC02633ANDUP)ME12002

43min
pages 230-235, 237-298

JOHNDEEREENGINE4045TF270(SNAC02633ANDUP)ME12002

3min
pages 226-229

JOHNDEEREENGINE4045TF270(SNAC02633ANDUP)ME12002

5min
pages 222-225

JOHNDEEREENGINE4045TF270(SNAC02633ANDUP)ME12002

4min
pages 216-221

HYDRAULICSYSTEMME12002

2min
pages 208, 211-215

ME12002HYDRAULICSYSTEM

1min
pages 205-207

ME12002HYDRAULICSYSTEM

1min
pages 203-204

HYDRAULICSYSTEMME12002

1min
page 202

ME12002HYDRAULICSYSTEM

1min
page 201

ME12002HYDRAULICSYSTEM

1min
pages 199-200

HYDRAULICSYSTEMME12002

1min
pages 188-190

ME12002HYDRAULICSYSTEM

1min
page 187

HYDRAULICSYSTEMME12002

1min
page 186

ME12002HYDRAULICSYSTEM

1min
page 185

ME12002HYDRAULICSYSTEM

3min
pages 179-184

HYDRAULICSYSTEMME12002

1min
page 174

HYDRAULICSYSTEMME12002

2min
pages 168-173

ME12002HYDRAULICSYSTEM

3min
pages 161-167

HYDRAULICSYSTEMME12002

1min
page 160

ME12002HYDRAULICSYSTEM

1min
page 159

ME12002HYDRAULICSYSTEM

1min
pages 155-156

ME12002HYDRAULICSYSTEM

1min
pages 153-154

HYDRAULICSYSTEMME12002

1min
page 152

ME12002HYDRAULICSYSTEM StraightTravelSpool(noadditionalactuation)

1min
page 151

ME12002HYDRAULICSYSTEM

1min
pages 149-150

HYDRAULICSYSTEMME12002

3min
pages 140-146

ME12002HYDRAULICSYSTEM

1min
page 139

ME12002HYDRAULICSYSTEM

1min
pages 137-138

RegenerationCircuit

3min
pages 132-136

HYDRAULICSYSTEMME12002

3min
pages 128-131

ME12002HYDRAULICSYSTEM

1min
page 125

OperatingMainRelief

1min
page 124

HYDRAULICSYSTEMME12002

1min
page 124

ME12002HYDRAULICSYSTEM OperatingPilotPressure

1min
page 123

FineMetering

1min
page 117

HYDRAULICSYSTEMME12002 ValveStructure

1min
page 116

HYDRAULICSYSTEMME12002

1min
pages 104-109

HYDRAULICSYSTEMME12002

1min
pages 102-103

ME12002HYDRAULICSYSTEM

1min
page 101

HYDRAULICSYSTEMME12002

1min
page 100

ME12002HYDRAULICSYSTEM

1min
page 99

ME12002HYDRAULICSYSTEM

1min
page 97

ME12002HYDRAULICSYSTEM

1min
page 95

HYDRAULICSYSTEMME12002

1min
page 94

HYDRAULICSYSTEMME12002

1min
page 92

HYDRAULICSYSTEMME12002

5min
pages 82-91

HYDRAULICSYSTEMME12002

2min
pages 78-81

ME12002HYDRAULICSYSTEM

1min
page 77

HYDRAULICSYSTEMME12002

1min
page 76

HYDRAULICSYSTEMME12002

1min
page 74

HYDRAULICSYSTEMME12002

1min
pages 72-73

MAINTENANCEME12002

4min
pages 54-57, 59-64

MAINTENANCEME12002

1min
pages 52-53

MAINTENANCEME12002

2min
pages 48-51

MAINTENANCEME12002 HydraulicPumpPartInspection

2min
pages 42-47

ME12002TECHNICALDATA

1min
pages 13-14
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.