JLG 40HA Parts Manual (3120673) - PDF Download En

Page 274

SECTION 7 - ELECTRICAL FIGURE 7-1. ELECTRICAL DIAGRAM LIST

ITEM

PART NUMBER

4931947 1281985 0610091 3740049 4931946 3990010 3740049 0140016 4931954 0140016 3740049 4360089 4932638 1282091 0610104 4932639 1282091 4932676 3740049 3990010 1060341 0253077 0140026 1540002 0254240 1281701 4932362 1281526 1060042 4460049 0960239 3300047 4932047 1281479 4921305 4360201 0251537 1281525 4921361 4360065 2920026

274

QTY Ref Ref

DESCRIPTION ELECTRICAL DIAGRAM LIST Note: Diagrams not shown are available from the JLG Service Department. Alarm Electrical Diagrams Options Ref Machines Built Prior to January 1993: Ref Travel/Back-up/Swing Descent Electrical Diagram Ref Travel/Back-up/Swing Descent Electrical Diagram Ref 1 Card, Circuit 1 Relay Motion Electrical Diagram Ref 2 Diode - 6 Amp 1 Relay, Bosch - SPDT 1 Alarm, Horn Tilt Electrical Diagram (5) Ref 1 Alarm, Horn 1 Relay, Bosch - SPDT 1 Flasher - 12V Machines Built January 1993 to Present: Ref Travel Electrical Diagram Ref Travel Electrical Diagram Ref 1 Card, Circuit Motion Electrical Diagram (Standard Bang-Bang and Ref Proportional Controls) Motion Electrical Diagram (Standard Bang - Bang and Ref Proportional Controls) Motion Electrical Diagram (Hydraulic Controls) Ref 1 Relay 2 Diode - 6 Amp 11 ft/3.4m Cable, Electrical - 16/2 Tilt Electrical Diagram Ref 1 Alarm 1 Capacitor Cold Weather Electrical Diagram (Deutz) Ref Cold Weather Electrical Diagram (Deutz) Ref Collector Ring Electrical Diagram (4WS) Ref Collector Ring Electrical Diagram (4WS) Ref 15 ft Cable, Electrical - 16/5 1 Connector, Strain Relief (At Ground Control Box) 1 Bushing 1 Nut, Conduit Dual Fuel Electrical Diagram (Ford) Ref Dual Fuel Electrical Diagram (Ford) Ref 1 Harness (M.T.B. to Gas and LP Solenoid Valves) 1 Switch, Toggle Engine Distress Electrical Diagram - Deutz Machines Ref Engine Distress Electrical Diagram - Deutz Machines Ref 1 Harness 1 Switch, Pressure 1 Lamp, Indicator (At Platform Console)

40HA

REV

G G

-

B

2 D 2 D -

5

B D A C

B -

D E

3120673


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

FIGURE 9-2. MODEL 40HA WITH STANDARD BANG-BANG CONTROLS VARIABLE PARTS

4min
pages 308-310

FIGURE 9-1. MODEL 40HA WITH STANDARD BANG-BANG CONTROLS STANDARD PARTS

4min
pages 306-307

FIGURE 6-10. HYDRAULIC DIAGRAM LIST

4min
pages 270-272

FIGURE 8-1. DECALS INSTALLATION

5min
pages 300-304

FIGURE 7-1. ELECTRICAL DIAGRAM LIST

7min
pages 274-279

FIGURE 6-8. HYDRAULIC DIAGRAM - STANDARD (HYDRAULIC CONTROLS

2min
pages 264-267

FIGURE 6-6. HYDRAULIC DIAGRAM - STANDARD (STANDARD BANG-BANG CONTROLS/DEUTZ MACHINES FIGURE 6-7. HYDRAULIC DIAGRAM - STANDARD (STANDARD BANG-BANG CONTROLS/FORD AND KUBOTA MACHINES) ......................................................................................................................................................................................................260

4min
pages 256-263

FIGURE 6-5. HYDRAULIC DIAGRAM - ROTATE

1min
pages 254-255

FIGURE 6-4. HYDRAULIC DIAGRAM - DRIVE (4WD

2min
pages 250-253

FIGURE 6-2. HYDRAULIC DIAGRAM - AXLE LOCKOUT (4WD

1min
pages 244-245

FIGURE 6-3. HYDRAULIC DIAGRAM - DRIVE (2WD

1min
pages 246-249

FIGURE 5-9. CLYINDER BELLOWS INSTALLATION (OPTIONAL

1min
pages 238-240

FIGURE 6-1. HYDRAULIC DIAGRAM - AXLE LOCKOUT (2WD

1min
pages 242-243

FIGURE 5-6. LIFT CYLINDER ASSEMBLY - TOWER BOOM (STANDARD PARTS

1min
pages 230-231

FIGURE 5-7. STEER CYLINDER ASSEMBLIES

1min
pages 232-233

FIGURE 5-3. PLATFORM LEVEL CYLINDER ASSEMBLY (MACHINES BUILT OCTOBER 1992 TO PRESENT

1min
pages 222-223

FIGURE 4-9. OPTIONAL COMMON PLATFORM MOUNTED COMPONENTS

2min
pages 214-216

FIGURE 4-7. CONTROL BOX ASSEMBLY (HYDRAULIC CONTROLS

2min
pages 206-209

FIGURE 4-6. CONSOLE BOX ASSEMBLY (PROPORTIONAL CONTROLS - FEBRUARY 1993 TO PRESENT

4min
pages 202-205

FIGURE 4-5. CONSOLE BOX ASSEMBLY (PROPORTIONAL CONTROLS - PRIOR TO FEBRUARY 1993

3min
pages 198-201

FIGURE 4-4. CONSOLE BOX ASSEMBLY (STANDARD BANG-BANG CONTROLS

3min
pages 194-197

FIGURE 4-3. ROTATOR MOTOR ASSEMBLY

1min
pages 192-193

FIGURE 3-1. BOOMS AND LIMIT SWITCHES INSTALLATIONS

2min
pages 170-173

FIGURE 4-2. LOW MOUNT PLATFORMS AND FOOTSWITCH INSTALLATIONS

3min
pages 188-191

FIGURE 4-1. STANDARD PLATFORM AND FOOTSWITCH INSTALLATION

5min
pages 182-187

FIGURE 2-32. HOODS INSTALLATIONS (WITH NOISE REDUCTION OPTION

1min
pages 166-168

FIGURE 2-30. HOODS INSTALLATIONS (WITH 2 DOORS AT GROUND CONTROL BUILT PRIOR TO AUGUST 1990

1min
pages 158-161

FIGURE 2-26. TANKS INSTALLATION

2min
pages 144-147

APRIL 1993 TO PRESENT AND FORD POWER BUILT FEBRUARY 1993 TO PRESENT

1min
pages 142-143

FIGURE 2-21. PUMP ASSEMBLY - SUNSTRAND

2min
pages 132-135

PRIOR TO OCTOBER 1991 FIGURE 2-25. PUMP ASSEMBLY - BARNES (USED ON HYDRAULIC CONTROLS MACHINES WITH DEUTZ POWER BUILT

1min
pages 140-141

MACHINES BUILT JANUARY 1993 TO PRESENT FIGURE 2-24. PUMP ASSEMBLY - BARNES (USED ON HYDRAULIC CONTROL MACHINES WITH DEUTZ POWER BUILT

1min
pages 138-139

FIGURE 2-22. PUMP ASSEMBLY - BARNES (USED ON STANDARD BANG-BANG AND PROPORTIONAL CONTROLS MACHINES BUILT APRIL/MAY 1990 TO JANUARY 1993 FIGURE 2-23. PUMP ASSEMBLY - BARNES (USED ON STANDARD BANG-BANG AND PROPORTIONAL CONTROLS

1min
pages 136-137

FIGURE 2-20. KUBOTA V1200B DIESEL ENGINE INSTALLATION

5min
pages 126-131

FIGURE 2-19. 110 VOLT GENERATOR INSTALLATION (FORD

1min
pages 122-125

FIGURE 2-15. DEUTZ ENGINE INSTALLATION

11min
pages 98-105

FIGURE 2-14. SWING HUB ASSEMBLY (MACHINES BUILT THROUGH 1992 ONLY

1min
pages 96-97

FIGURE 2-12. SWING BRAKE ASSEMBLY (PRIOR TO AUGUST 1991

1min
pages 92-93

FIGURE 2-11. SWING MOTOR ASSEMBLY (1993 TO PRESENT

1min
pages 90-91

FIGURE 2-10. SWING MOTOR ASSEMBLY (AUGUST 1991 THROUGH 1992

1min
pages 88-89

FIGURE 2-8. TURNTABLE, BEARING AND SWING DRIVE INSTALLATION

3min
pages 82-85

FIGURE 2-7. VALVE ASSEMBLY - GROUND CONTROL (HYDRAULIC CONTROLS

1min
pages 80-81

FIGURE 2-5. CONTROL VALVE ASSEMBLY - PROPORTIONAL

1min
pages 74-77

FIGURE 2-4. CONTROL VALVE ASSEMBLY - BANG-BANG (STANDARD CONTROLS

1min
pages 72-73

PROPORTIONAL VALVES

6min
pages 62-67

FIGURE 2-3. CONTROL VALVE ASSEMBLY - BANG-BANG WITH DUMP SECTION

3min
pages 68-71

FIGURE 1-12. LOCKOUT VALVE ASSEMBLY

1min
pages 48-49

FIGURE 1-14. TOW PACKAGE INSTALLATIONS

1min
pages 52-54

FIGURE 1-13. VALVE ASSEMBLY (USED WITH OPTIONAL 4WS

1min
pages 50-51

FIGURE 1-11. VALVES INSTALLATION - FRAME-MOUNTED

2min
pages 44-47

FIGURE 1-8. DRIVE HUB ASSEMBLY

1min
pages 34-35

FIGURE 1-2. FRAME, STEERING AND AXLE INSTALLATIONS - 2WD AND 4WD (WITH 4 WHEEL STEER

6min
pages 12-17

FIGURE 1-7. DRIVE HUB ASSEMBLY

2min
pages 30-33

FIGURE 1-3. TIRE AND WHEEL DRIVE INSTALLATIONS

4min
pages 18-21

FIGURE 1-5. DRIVE BRAKE ASSEMBLY - AUSCO (PRIOR TO MARCH 1992

1min
pages 24-25

FIGURE 1-10. DRIVE HUB/BRAKE ASSEMBLIES (1992 TO PRESENT

4min
pages 40-43

FIGURE 1-9. DRIVE HUB/BRAKE ASSEMBLIES (THROUGH 1992

2min
pages 36-39

FIGURE 1-1. FRAME, STEERING AND AXLE INSTALLATIONS - 2WD AND 4WD (WITH 2 WHEEL STEER

5min
pages 8-11
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
JLG 40HA Parts Manual (3120673) - PDF Download En by www.heydownloads.com - Issuu