2.2

Preservation and storage

2.2.2

Preservation and storage of the machine for 1–2 months

Before storing the machine, clean and wash the whole machine. Before putting the machine out of operation, start the machine to warm operating fluids up to the operating temperature. Then refill the operating fluids up to the levels specified in this Operating Manual. Before preserving and storing, clean the machine from coarse impurities and wash.

Wash the machine only in areas with intercepting traps to intercept the contaminated water and detergents.

Then it is recommended to perform the following tasks: •

repair damaged paintwork,

service lubrication points according to instructions stated in the manual,

check the pressure in tyres if the machine is equipped with wheels; protect the tyres from direct sunlight,

check that the water tanks are drained if they are on the machine,

check that the coolant has the desired antifreeze properties,

check the batteries for charging and recharge them if required according to instructions of the manufacturer

apply chemical preservatives on chromium-plated surfaces of piston-rods,

we recommend you to protect the machine from corrosion by spraying a chemical preservative, particularly in areas where corrosion can occur.

If you treat the machine as above described, it is not necessary to prepare the machine in a special manner before it is put into operation again. It is only necessary to wash the machine to remove applied chemical preservatives.

Park the machine on a flat solid surface in a safe area when there is no danger of damage to the machine by a natural disaster, e.g. landslides, floods and fire. Wash the machine only in areas with intercepting traps to intercept the contaminated water and detergents. The following tasks must be performed first on the machine: •

stop the machine and turn off the engine

turn off the battery disconnecter

the front blade of the hopper must be folded down and secured

the machine screed must be placed horizontally on a flat and solid surface

protective covers of the individual instruments and machine covers must be locked

if the machine is equipped with a gas bottle, the gas bottle must be removed from the machine and stored in a special area.

54

F80W


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Troubleshooting

4min
pages 188-189

3.6 Lubrication and maintenance operations

6min
pages 184-187

3.6 Lubrication and maintenance operations

2min
pages 182-183

3.6 Lubrication and maintenance operations

4min
pages 178-181

3.6 Lubrication and maintenance operations

2min
pages 176-177

Lubrication and maintenance operations

1min
pages 174-175

3.6 Lubrication and maintenance operations

3min
pages 170-174

3.6 Lubrication and maintenance operations

2min
pages 168-169

Lubrication and maintenance operations

1min
pages 166-167

3.6 Lubrication and maintenance operations

2min
pages 164-166

3.6 Lubrication and maintenance operations

1min
pages 162-163

3.6 Lubrication and maintenance operations

1min
pages 160-161

3.6 Lubrication and maintenance operations

2min
pages 158-159

3.6 Lubrication and maintenance operations

1min
pages 156-157

3.6 Lubrication and maintenance operations

1min
pages 154-155

3.6 Lubrication and maintenance operations

7min
pages 148-153

3.6 Lubrication and maintenance operations

5min
pages 144-147

3.6 Lubrication and maintenance operations

1min
pages 142-143

Lubrication and maintenance operations

1min
pages 140-141

LUBRICATION AND SERVICE PLAN

1min
pages 138-139

3.2 Sp ecification of operating fluids

1min
page 134

3.2 Specification of operating fluids

1min
pages 132-133

3.1 S afety and other measures during maintenance of the machine

2min
pages 130-131

3 MAINTENANCE MANUAL F80W (Hatz)

1min
page 129

2.8 Special conditions to use the machine

2min
pages 124-125

2.7 Machine transport

4min
pages 120-123

2.6 O peration of the screed

4min
pages 114-117

2.6 O peration of the screed

1min
pages 112-113

2.6 O peration of the screed

2min
pages 110-111

2.6 O peration of the screed

1min
pages 108-109

2.6 O peration of the screed

4min
pages 104-107

2.6 O peration of the screed

1min
pages 102-103

2.6 Operation of the screed

1min
page 101

2.5 O peration of the machine

1min
page 100

2.5 O peration of the machine

2min
pages 98-99

2.5 O peration of the machine

1min
pages 96-97

2.5 O peration of the machine

1min
pages 94-95

2.5 O peration of the machine

4min
pages 90-93

2.5 O peration of the machine

3min
pages 86-89

2.5 O peration of the machine

2min
pages 82-85

2.5 O peration of the machine

1min
pages 80-81

2.4 M achine description

1min
pages 76-77

2.2 P reservation and storage

1min
page 62

2.2 P reservation and storage

3min
pages 60-61

M ain safety precautions

3min
pages 58-59

2.1 M ain safety precautions

3min
pages 56-57

2.1 ain safety precautions

5min
pages 54-55

2.1 M ain safety precautions

2min
pages 52-53

2.1 M ain safety precautions

4min
pages 40-51

2.1 M ain safety precautions

6min
pages 38-39

Main safety precautions

4min
pages 36-37

1.3 Technical data

1min
page 32

1.3 Technical data

1min
pages 30-31

1.3 Technical data

1min
pages 28-29

1.3 Technical data

2min
pages 26-27

1.3 Technical data

1min
pages 24-25

SPECIFIC ATION MANUAL

1min
pages 21-23

1 SPECIFICATION MANUAL

1min
pages 16-17

OP ER ATI NG M ANUAL

2min
pages 1, 3, 5, 7-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Dynapac F80W Hatz Asphalt Paver Wheeled Operating Manual 4812077835 - PDF DOWNLOAD by www.heydownloads.com - Issuu