Dynapac F80W Hatz Asphalt Paver Wheeled Operating Manual 4812077835 - PDF DOWNLOAD

Page 170

3.6

Lubrication and maintenance operations

Battery charging procedure: •

Open the left material hopper side cover (1).

Clean the battery surface.

Remove the battery from the machine.

When disconnecting the battery, first disconnect the cable of the (-) pole.

Charge the battery.

Mount the battery on the machine.

Check the condition of the (+) pole, (-) pole and clamps.

Clean the (+) pole, the (-) pole and the clamps.

Apply a thin layer of grease on the clamps.

When connecting the battery, first connect the (+) pole.

Close the left material hopper side cover (1).

1 D451126C

Note Perform battery charging as needed according to instructions of the battery manufacturer.

Perform battery check when the machine is parked on a flat and solid surface with the engine and battery disconnecter off. When checking the battery, use the prescribed protective equipment. Perform battery charging as needed according to instructions of the battery manufacturer. Do not eat, drink and smoke and do not use a naked flame while working. Danger of fire!

Keep the battery dry and clean. Charge the battery if it is low. Perform battery charging outside the machine. First disconnect the minus pole cable (-) when disconnecting the battery. First connect the plus pole cable (+) when connecting the battery. Do not disconnect the battery when the engine is running. Disconnect the battery when repairing the machine wiring. Disconnect the battery when welding on the machine. Caution! Never make direct conductive connection between both poles of the battery to avoid a short circuit and a hazard of explosion of the battery. Do not check live wires by touching the machine frame.

164

In case of electrolyte spillage, wash the affected area with water and neutralize with lime. Hand over the old inoperative battery for disposal according to the national regulations.

F80W


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Troubleshooting

4min
pages 188-189

3.6 Lubrication and maintenance operations

6min
pages 184-187

3.6 Lubrication and maintenance operations

2min
pages 182-183

3.6 Lubrication and maintenance operations

4min
pages 178-181

3.6 Lubrication and maintenance operations

2min
pages 176-177

Lubrication and maintenance operations

1min
pages 174-175

3.6 Lubrication and maintenance operations

3min
pages 170-174

3.6 Lubrication and maintenance operations

2min
pages 168-169

Lubrication and maintenance operations

1min
pages 166-167

3.6 Lubrication and maintenance operations

2min
pages 164-166

3.6 Lubrication and maintenance operations

1min
pages 162-163

3.6 Lubrication and maintenance operations

1min
pages 160-161

3.6 Lubrication and maintenance operations

2min
pages 158-159

3.6 Lubrication and maintenance operations

1min
pages 156-157

3.6 Lubrication and maintenance operations

1min
pages 154-155

3.6 Lubrication and maintenance operations

7min
pages 148-153

3.6 Lubrication and maintenance operations

5min
pages 144-147

3.6 Lubrication and maintenance operations

1min
pages 142-143

Lubrication and maintenance operations

1min
pages 140-141

LUBRICATION AND SERVICE PLAN

1min
pages 138-139

3.2 Sp ecification of operating fluids

1min
page 134

3.2 Specification of operating fluids

1min
pages 132-133

3.1 S afety and other measures during maintenance of the machine

2min
pages 130-131

3 MAINTENANCE MANUAL F80W (Hatz)

1min
page 129

2.8 Special conditions to use the machine

2min
pages 124-125

2.7 Machine transport

4min
pages 120-123

2.6 O peration of the screed

4min
pages 114-117

2.6 O peration of the screed

1min
pages 112-113

2.6 O peration of the screed

2min
pages 110-111

2.6 O peration of the screed

1min
pages 108-109

2.6 O peration of the screed

4min
pages 104-107

2.6 O peration of the screed

1min
pages 102-103

2.6 Operation of the screed

1min
page 101

2.5 O peration of the machine

1min
page 100

2.5 O peration of the machine

2min
pages 98-99

2.5 O peration of the machine

1min
pages 96-97

2.5 O peration of the machine

1min
pages 94-95

2.5 O peration of the machine

4min
pages 90-93

2.5 O peration of the machine

3min
pages 86-89

2.5 O peration of the machine

2min
pages 82-85

2.5 O peration of the machine

1min
pages 80-81

2.4 M achine description

1min
pages 76-77

2.2 P reservation and storage

1min
page 62

2.2 P reservation and storage

3min
pages 60-61

M ain safety precautions

3min
pages 58-59

2.1 M ain safety precautions

3min
pages 56-57

2.1 ain safety precautions

5min
pages 54-55

2.1 M ain safety precautions

2min
pages 52-53

2.1 M ain safety precautions

4min
pages 40-51

2.1 M ain safety precautions

6min
pages 38-39

Main safety precautions

4min
pages 36-37

1.3 Technical data

1min
page 32

1.3 Technical data

1min
pages 30-31

1.3 Technical data

1min
pages 28-29

1.3 Technical data

2min
pages 26-27

1.3 Technical data

1min
pages 24-25

SPECIFIC ATION MANUAL

1min
pages 21-23

1 SPECIFICATION MANUAL

1min
pages 16-17

OP ER ATI NG M ANUAL

2min
pages 1, 3, 5, 7-9
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.