Adjusting the endless belts 7. ADJUSTMENT - OPEN TAILGATE 7.1 Opening the tailgate – Switch on the machine. – Run the engine 2 minutes with low speed (300-350 rpm) to run in the endless belts. – Open the tailgate and run the engine for 30 seconds with full speed. – Shut down the machine. Danger! Always shut the engine down and pull the ignition key out before working or performing adjustment work on the tailgate and in the baling chamber. – Move lever (M) to securing position (Z) to keep the tailgate open. Note! Lever (M) must generally remain in securing position while working under the opened tailgate or inside the baling chamber.
68
ABA Riemen - VRT 260/280 - 299 498.0