1 minute read

2. Preparing the baler

1

2 3

2 2. PREPARING THE BALER

–Connect the 2-pole supply line (1) between baler and tractor. –Connect hydraulic hoses (3) (1 red, 1 green) for tailgate control to a double acting control valve. (Fig.2) –Connect the third hydraulic hose (2) to a single acting control valve. (Fig.2) –Switch on the control terminal.

Note!

The control terminal needs to be switched on to perform the following tests and adjustments.

–Switch on the machine. –Run the engine 2 minutes with low speed (300-350 rpm) to run in the endless belts. –Shut down the machine.

This article is from: