Adjusting the endless belts 2. PREPARING THE BALER – Connect the 2-pole supply line (1) between baler and tractor. 1
– Connect hydraulic hoses (3) (1 red, 1 green) for tailgate control to a double acting control valve. (Fig. 2)
3
– Connect the third hydraulic hose (2) to a single acting control valve. (Fig. 2)
2
– Switch on the control terminal. Note! The control terminal needs to be switched on to perform the following tests and adjustments. 2 – Switch on the machine. – Run the engine 2 minutes with low speed (300-350 rpm) to run in the endless belts. – Shut down the machine.
56
ABA Riemen - VRT 260/280 - 299 498.0