Template Name: OML_2_col Template Date: 1994_04_22
907871
844/642 Telehandler
Alt= to hide template information Alt+ to display template information
SINGLE CHAIN REPLACEMENT
STEP 7
STEP 10
G1643MP
G1618MP
Pull the clevis block forward slightly and tie a long ro pe to th e c lev is block to aid in sin g le cha in installation.
Remove the adjustment clevis from the old chain by removing one cotter pin and the retainer pin.
STEP 11 STEP 8
G1633MP
Remove the clevis block from the old chain by removing one cotter pin and the retainer pin.
G1640MP
Use a crowfoot wrench with a long extension to reach in and loosen the locking nut on the clevis. Once the locking nut is loosened, push the clevis forward and remove both nuts from the clevis.
INSTALLATION STEP 12
STEP 9 Remove the single chain by pulling out from the rear of the boom. Remove the rope from the single chain clevis, and leave the rope in place for single chain installation. NOTE: Check the condition of the sheave and roller bearing at this time. Proceed to Step 26 if repair is required.
G1634MP
Install the clevis block on the new chain using the retainer pin and cotter pin. PRINTED IN U.S.A.
705-2
913250