844/642 Telehandler HYDRAULICS
STEP 18
Step 20
OPEN the load control valve of the flowmeter. Start the engine and run at 1000 RPM.
STEP 19
G0805016
Hold the joystick in the LOWER position and slowly close the load control valve on the flowmeter until the pressure gauge reads 3000 psi (207 bar).


If the pressure is 3000 psi (207 bar) repair or replace the lift cylinder being tested.
If the pressure is less than 3000 psi (207 bar) proceed to Step 21.
Step 21
Move the joystick to the LOWER position and hold. The pressure gauge should read 3000 psi (207 bar).

If the pressure is less than 3000 psi (207 bar) proceed to Step 20.
If the pressure is more than 3000 psi (207 bar), follow the procedure in the Main Control Valve Pressure Relief Test and Adjustment section of this manual.
G0805016
Release the joystick, OPEN the load control valve and shut OFF the engine. Remove the hose from the LOWER port of the opposite side lift cylinder. Install a plug in the hose and cap the cylinder port.