844/642 Telehandler ELECTRICAL

STEP 18

FUEL SHUT-OFF SOLENOID TEST

Step 20

Install the positive (+) test lead to the fuel shut-off solenoid. Turn the key switch to the ON position. The multimeter should read 12 to 13 volts.

If there is no voltage, proceed to the next step.

If there is 12 to 13 volts, but the engine will not start, replace the fuel shut-off solenoid valve.

Step 21

Check the fuel shut-off solenoid fuse (#2) (1) and test power to the fuse (Step 4) and ignition relay (2) (Steps 5 and 6).

If the fuel shut-off fuse and ignition relay are operating properly, repair or replace the red wire between the fuse and the fuel shut-off solenoid.