Template Name: OML_2_col Template Date: 1994_04_22
0-00000 Alt= to hide template information Alt+ to display template information
844/642 Telehandler
HYDRAULICS
STEP 22
G0505046
Start the engine and run at 1000 RPM. Hold the joystick in the LOWER position. If the pressure gauge reads 3000 psi (207 bar), repair or replace the opposite side lift cylinder. If the pressure is less than 3 000 psi (207 ba r, proceed to Step 23.
STEP 23
G0805015
Hold the joystick in the LOWER position. Slowly close the load control valve of the flowmeter until the pressure gauge reads 3000 psi (207 bar). If the pressure is 3000 psi (207 bar), repair or replace both lift cylinders. If the pressure is less than 3000 psi (207 bar), follow the procedure in the Main Control Valve Pressure Relief Test and Adjustment section of this manual.
PRINTED IN U.S.A.
601-18
913250