Procedures for Removal and Installation of Cab Inner and Outer Parts Assembly and Disassembly Section
SH700-5
Procedures for Removal and Installation of Cab Inner and Outer Parts Removal and Installation of Cab Assembly ・ Be sure to stop the engine before beginning work. Caution ・ Be sure to inspect the wire rope and other lifting equipment before beginning work. ・ Do not stand or pass under the suspended load.
AL
Items to prepare
TE RN
• Wrenches (13 mm, 19 mm) • Box wrenches (10 mm, 13 mm, 19 mm) • Eyebolts (M24 × 4) • Chains (wire ropes) (with the required breaking load) • Liftcrane (with the required lifting capacity)
IN
• Lubricating oil • Rag • Cleaning fluid
E
• Wood planks, etc.
CO US N F E ID O E F N TS TI M AL GL : F O OR BA T L H
1. Removal of cab assembly [1] Remove the operator's seat. (For details, see "Removal and Installation of Operator's Seat".) [2] Use a box wrench (10 mm) to remove the 4 bolts (1) and another box wrench (13 mm) to remove the 2 bolts (2), and then remove the rear cover (3).
[3] Use a box wrench (10 mm) to remove the 2 bolts (4), and then remove the air conditioner ducts on both sides (5).
378
WSM-13-17-005EN 1