Attachments Removal and Installation of Boom Cylinder
TE RN
AL
・ Stop the machine on a level location with good footing. ・ Be sure to stop the engine before beginning work. ・ When working together with others, always be sure to exchange signals and pay adequate attention to safety. Caution ・ Always wear protective devices (protective eyewear and safety shoes, etc.) when working with a hammer. ・ Be sure to inspect the nylon sling and other lifting equipment before beginning work. ・ Do not stand or pass under the suspended load.
Items to prepare
IN
• Wrenches (22 mm, 30 mm, 36 mm) • Crowbar • Wire rope (with the required lifting capacity)
CO US N F E ID O E F N TS TI M AL GL : F O OR BA T L H
E
• Liftcrane (with the required lifting capacity) • Marking pen • Cap • Plug • Hammer
• Striking rod • Grease • Rag
• Cleaning fluid • Crosstie • Wire
1. Removal of boom cylinder
• When removing only the boom cylinder, put the attachments in the temporary decommissioning posture. • When removing as far as the boom, first remove the bucket, bucket cylinder, arm, and arm cylinder according to their respective removal and installation procedures. Bring the boom top in contact with the ground.
[1] Use a liftcrane and nylon sling (1) to secure the boom cylinders (2) and (3).
336
WSM-13-15-018EN 17