OPERATING INSTRUCTIONS
F106.7/F106.7A/F156.7/F156.7A
Tie-down point at the rear
Crane loading Lock the articulated joint if the machine is to be loaded with a crane.
Loading by crane requires a lifting tackle. See the “Technical data” for the required lifting capacity.
Fig. 3
Unlock the articulated joint lock after transporting but before unloading the machine. Tie-down point in the middle
Fig. 6
Fig. 4
Tie-down point in front
Fig. 7
The lifting gear fastening points are indicated by marks on the machine (Fig. 6 + 7). Make sure the fastening ropes between traverse and machine are perpendicular (Fig. 6 + 7).
Fig. 5