Crane loading

Tie-down point at the rear

Crane loading

Lock the articulated joint if the machine is to be loaded with a crane.

Loading by crane requires a lifting tackle. See the “Technical data” for the required lifting capacity.

Fig. 3

Unlock the articulated joint lock after transporting but before unloading the machine.

Tie-down point in the middle

Fig. 6

Fig. 4

Tie-down point in front

Fig. 5 Fig. 7 The lifting gear fastening points are indicated by marks on the machine (Fig. 6 + 7). Make sure the fastening ropes between traverse and machine are perpendicular (Fig. 6 + 7).