Crane loading
from New Holland F106.7 F106.7A F156.7 F156.7A Grader Tier III Operator's Manual 84147951 - PDF DOWNLOAD
Tie-down point at the rear
Crane loading
Lock the articulated joint if the machine is to be loaded with a crane.
Loading by crane requires a lifting tackle. See the “Technical data” for the required lifting capacity.
Fig. 3
Unlock the articulated joint lock after transporting but before unloading the machine.
Tie-down point in the middle
Fig. 6
Fig. 4
Tie-down point in front
Fig. 5 Fig. 7 The lifting gear fastening points are indicated by marks on the machine (Fig. 6 + 7). Make sure the fastening ropes between traverse and machine are perpendicular (Fig. 6 + 7).