Template Name: OML_2_col Template Date: 1994_04_22
907871 Alt= to hide template information Alt+ to display template information
519 Telehandler
HYDROSTATIC PUMP
STEP 29
STEP 32
1
1
1
G0707014
G0707016
Install the three hydraulic cooler mounting bolts (1).
Tighten the hydraulic reservoir fill line.
STEP 30
STEP 33 3 2 4 2 1 1
2 3
G0707011
G0707049
Install the two mounting bolts (1). Remove the cap and plug and install the hydraulic hose (2).
Install the coolant recovery tank (1) using the two mount bolts (2). Install the two hoses (3) on the tank and install the hose P-clamp bolt (4).
STEP 31
STEP 34 Re-install the hydraulic pump. Complete Steps 11 through 22 of Section 602 for the correct procedures.
STEP 35 Re-install the battery. Complete Steps 6 through 9 of Section 302 for the correct procedure.
STEP 36 Refill the hydraulic reservoir.
STEP 37
G0707013
Remove the cap and plug and install the hydraulic cooler hose.
913302
Start the engine and check for leaks. If no leaks appear, continue to run the engine and test the steering and hydraulic functions for operation. Shut off the engine and check the hydraulic reservoir level. Add fluid if necessary.
501-7
PRINTED IN U.S.A.