Mustang Telehandler 519 Service Manual (913302) - PDF DOWNLOAD

Page 93

Template Name: OML_2_col Template Date: 1994_04_22

907871 Alt= to hide template information Alt+ to display template information

519 Telehandler

HYDROSTATIC PUMP

STEP 29

STEP 32

1

1

1

G0707014

G0707016

Install the three hydraulic cooler mounting bolts (1).

Tighten the hydraulic reservoir fill line.

STEP 30

STEP 33 3 2 4 2 1 1

2 3

G0707011

G0707049

Install the two mounting bolts (1). Remove the cap and plug and install the hydraulic hose (2).

Install the coolant recovery tank (1) using the two mount bolts (2). Install the two hoses (3) on the tank and install the hose P-clamp bolt (4).

STEP 31

STEP 34 Re-install the hydraulic pump. Complete Steps 11 through 22 of Section 602 for the correct procedures.

STEP 35 Re-install the battery. Complete Steps 6 through 9 of Section 302 for the correct procedure.

STEP 36 Refill the hydraulic reservoir.

STEP 37

G0707013

Remove the cap and plug and install the hydraulic cooler hose.

913302

Start the engine and check for leaks. If no leaks appear, continue to run the engine and test the steering and hydraulic functions for operation. Shut off the engine and check the hydraulic reservoir level. Add fluid if necessary.

501-7

PRINTED IN U.S.A.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Mustang Telehandler 519 Service Manual (913302) - PDF DOWNLOAD by www.heydownloads.com - Issuu