Mustang Telehandler 519 Service Manual (913302) - PDF DOWNLOAD

Page 46

Template Name: OML_2_col Template Date: 1994_04_22

907871 Alt= to hide template information Alt+ to display template information

519 Telehandler

ENGINE

STEP 43

STEP 45 See the Operator’s Manual for the specified hydraulic fluid, engine coolant and correct levels. Fill the hydraulic reservoir with the specified oil. Fill the radiator and engine block with the specified coolant. Bleed the fuel system by following the procedures in the Service / As Required section of the Engine Operation and Maintenance Manual. G0707005

Install the radiator cover. Complete Steps 11 and 12 of Section 800 for the correct procedure.

STEP 44

STEP 46 Start the engine and run until the coolant has reached operating temperature. Adjust the throttle cable linkage until the engine speed is 1100 RPM at low idle and 2700 to 2800 RPM at high idle.

STEP 47 Check the hydraulic functions for proper operation. Shut off the engine and check for leaks and correct fluid levels.

G0607021

Install the engine cover. Complete Steps 4 through 6 of Section 800 for the correct procedure.

913302

201-18

PRINTED IN U.S.A.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.