Mustang Telehandler 519 Service Manual (913302) - PDF DOWNLOAD

Page 160

Template Name: OML_2_col Template Date: 1994_04_22

907871 Alt= to hide template information Alt+ to display template information

519 Telehandler

HYDRAULIC PUMP

STEP 16

STEP 19

2

2

1

1 2

2 G0907018

G0707008

Remove the brace supporting the oil cooler and install the wheel well (1) using the eight mounting bolts (2).

Install the floor panel (1) using the eight panel mounting bolts (2).

STEP 20

STEP 17

Re-install the battery. Complete Steps 6 through 9 of Section 302 for the correct procedure.

STEP 21 Refill the hydraulic reservoir. 2 1

STEP 22 Start the engine and check for leaks. If no leaks appear, continue to run the engine and test the steering and hydraulic functions for operation. Shut off the engine and check the hydraulic reservoir level. Add fluid if necessary.

2 G0607023

Re-install the battery tray (1) using the four mounting bolts (2).

STEP 18

G0607024

Remove the cap and plug and re-connect the pressure test hose under the battery tray. 913302

602-4

PRINTED IN U.S.A.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Mustang Telehandler 519 Service Manual (913302) - PDF DOWNLOAD by www.heydownloads.com - Issuu