Floods May 2003
Flood
T
his year the effects of nature impacted the College: full moon, high tides, strong winds and more water in the river. The result was that the College was flooded considerably. It delayed the construction of the pool by at least five weeks, even though the builders considered that they had filled the hole that had been prepared for the pool.
25