Attachments Attachments
SH200-5
Attachments Removal and Installation of Bucket ・ Stop the machine on a level location with good footing. ・ Be sure to stop the engine before beginning work. ・ When working together with others, always be sure to exchange signals and pay adequate Caution attention to safety. ・ Always wear protective devices (protective eyewear and safety shoes, etc.) when working with a hammer.
Items to prepare • Hammer • Striking rod • Screwdriver • Grease • Rag • Cleaning fluid
CO US N F E ID O E F N TS TI M AL GL : F O OR BA T L H
E
IN
TE
RN
[1] Place the back of the bucket parallel to the ground. [2] Use a screwdriver to remove the pin (2) rings (1), and then remove the bucket side and boom side pins.
AL
1. Removal of Bucket
381
1
Ring
2
Pin
RSM-13-15-001E 1