3 minute read

SH210-5 Removal and Installation of Swing Unit

Warning ・ Be sure to release hydraulic pressure before beginning work.

Caution ・ Be sure to stop the engine before beginning work. ・ Be sure to inspect the wire rope and other lifting equipment before beginning work. ・ Do not stand or pass under the suspended load. ・ When removing this product from the equipment it is mounted on, stop that equipment system and wait for the surface temperature of this product to fall to about 40 ℃ or below before removing it. Working on this product while it is still hot can cause burns. Additionally, always bleed out the pressure before removing any line from this product. Removing a pressurized line can result in oil spraying out and causing burns and oil leaking.

Items to prepare •Wrenches (14 mm, 19 mm, 22 mm, 27 mm, 36 mm, 41 mm) •Hexagon wrench (5 mm) •Box wrench (30 mm) •Pliers •Hammer •Grease •Specialty adapter for vacuum pump connection •Vacuum pump (vacuum pump power supply) •Extension cable •Wire rope (with the required breaking load) •Marking pen •Caps •Plugs •Crane (with the required lifting capacity) •Rag •Cleaning fluid •Wood planks, etc. 1.Removal of Swing Unit [1] Use a hexagon wrench (5 mm) to remove the 4 bolts (1), and then remove the air breather (2) on the hydraulic oil tank.

1 Bolt 2 Air breather

[2] Attach the specialty adapter (3) to the area where the air breather was removed, and set the vacuum pump.

Create negative pressure in the hydraulic oil tank using the vacuum pump (4).

[3] Use a wrench (19 mm) to remove the 6 bolts (5), and then remove the center cover (6).

3 Specialty adapter 4 Vacuum pump 5 Bolt 6 Center cover

[4] Use the wrenches [22 mm, 27 mm, 36 mm, 41 mm] to remove the hoses (7), (8), (9), (10), (11) and (12) from the swing motor. •Mark the swing motor and hoses so that the connectors can be matched during assembly. •Attach caps or plugs to the swing motor and hoses to prevent any entry of water, dust or dirt. •Clean the swing motor and hoses by spraying them with a parts cleaner to prevent scratching and prevent dirt from accumulating on the connectors.

[5] Use a wrench (19 mm) to remove the grease hose (13) that feeds grease to the swing motor reduction gear bearing.

[6] Use a wrench (19 mm) to remove the 3 bolts (14), and then remove the under cover (15).

7 Make-up hose (use 41 mm) 8 Main hose (right) (use 36 mm) 9 Main hose (left) (use 36 mm) 10 Drain hose (use 27 mm) 11 Drain hose (use 27 mm) 12 Pilot hose (use 22 mm) 13 Grease hose 14 Bolt 15 Under cover

[7] Use a wrench (14 mm) to remove the bolt (16) on the clamp (17) for the hose.

[8] After removing all of the hoses, use pliers to cut the wire band (19) that binds the hoses.

[9] Use a box wrench (30 mm) to remove the 11 bolts (20) from the swing unit.

16 Bolt 17 Clamp 18 Drain hose 19 Wire band 20 Bolt 21 Knock pin

[10]Wrap the wire rope (22) around the swing motor and lift it with a crane. •A knock pin (21) is driven into the installation section of the swing unit. Apply lubricating oil to the knock pin and pull it out together with the main unit of the swing motor while hitting with a hammer.

[11]Thoroughly check that the location is safe before lowering the swing unit on wood planks (23). •Thoroughly secure the swing unit so that it does not fall over.

21 Knock pin 22 Wire rope 23 Wood plank

2.Installation of Swing Unit [1] Perform the reverse of the removal procedure. When installing the swing unit, be careful with the position of the knock pin. The tightening torque for the bolts for installing the swing unit on the swing frame is 539 - 630 N•m. [2] Before driving, be sure to fill the inside of the motor casing with hydraulic oil from the drain port (1). Thoroughly perform air bleeding from the air bleed port (2). Use the level gauge (3) to check that gear oil for the reduction gear is filled to the stipulated volume.

1 Drain port 2 Air bleed port 3 Level gauge

This article is from: