JLG 45HA Parts Manual (3120626) - PDF Download En

Page 72

SECTION 2 - TURNTABLE FIGURE 2-3. CONTROL VALVES INSTALLATIONS - VICKERS (FORD GAS, DEUTZ DIESEL AND KUBOTA DIESEL)

72

45HA

3120626


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

FIGURE 10-4. JAPANESE MACHINE OPTIONS

1min
page 376

FIGURE 10-3. 440V ELECTRIC PEDESTAL MACHINE SPECIAL OPTIONS

1min
pages 374-375

FIGURE 10-1. SPECIAL OPTIONS LIST

4min
pages 368-371

FIGURE 10-2. U/L MACHINES SPECIAL OPTIONS

1min
pages 372-373

FIGURE 9-2. MODELS 45HA GAS AND DIESEL MACHINES WITH VICKERS VALVES VARIABLE PARTS

1min
page 366

FIGURE 9-1. MODELS 45HA GAS AND DIESEL MACHINES WITH VICKERS VALVES STANDARD PARTS

4min
pages 364-365

FIGURE 7-1. ELECTRICAL DIAGRAM LIST

8min
pages 328-333

FIGURE 8-2. DECALS INSTALLATIONS (45HA AUGUST 1991 TO PRESENT

5min
pages 358-362

FIGURE 8-1. DECALS INSTALLATIONS (45HA PRIOR TO AUGUST 1991

2min
pages 354-357

FIGURE 6-14. HYDRAULIC DIAGRAM LIST

5min
pages 324-326

FIGURE 6-11. TELESCOPE (MAIN BOOM) HYDRAULIC DIAGRAM

1min
pages 318-319

FIGURE 6-12. TELESCOPE (TOWER BOOM) HYDRAULIC DIAGRAM (FORD GAS AND DEUTZ DIESEL

1min
pages 320-321

FIGURE 6-10. SWING HYDRAULIC DIAGRAM (WITH VICKERS VALVES

1min
pages 316-317

FIGURE 6-8. ROTATION HYDRAULIC DIAGRAM

1min
pages 312-313

FIGURE 6-5. LIFT AND SLAVE (MAIN BOOM) HYDRAULIC DIAGRAM

1min
pages 302-303

FIGURE 6-7. PUMP HYDRAULIC DIAGRAM (VICKERS VALVES - ELECTRIC MACHINES

1min
pages 308-311

FIGURE 6-6. PUMP HYDRAULIC DIAGRAM (VICKERS VALVES - FORD GAS AND DEUTZ DIESEL MACHINES

2min
pages 304-307

FIGURE 6-1. HYDRAULIC DIAGRAM - AXLE LOCKOUT

1min
pages 290-291

FIGURE 5-13. TELESCOPE CYLINDER ASSEMBLY (TOWER BOOM) (JULY 1988 TO PRESENT

1min
pages 284-285

FIGURE 5-10. STEER CYLINDER ASSEMBLY (4WD

1min
pages 278-279

FIGURE 5-9. STEER CYLINDER ASSEMBLY (2WD SINGLE ACTING ROD

1min
pages 276-277

FIGURE 5-8. STEER CYLINDER ASSEMBLY (2WD - DOUBLE ACTING ROD

1min
pages 274-275

FIGURE 5-7. PLATFORM LEVEL CYLINDER ASSEMBLY (MAIN BOOM) (OCTOBER 1992 TO PRESENT

1min
pages 272-273

FIGURE 5-4. LIFT CYLINDER ASSEMBLY (MAIN BOOM

1min
pages 266-267

FIGURE 5-3. LEVEL CYLINDER ASSEMBLY (TOWER BOOM

1min
pages 264-265

FIGURE 5-5. LIFT CYLINDER ASSEMBLY (TOWER BOOM

1min
pages 268-269

FIGURE 5-1. ACCUMULATOR ASSEMBLY (MACHINES WITH STEPPER VALVES

1min
pages 260-261

FIGURE 5-2. AXLE LOCKOUT CYLINDER ASSEMBLY

1min
pages 262-263

FIGURE 4-10. OPTIONAL COMMON PLATFORM MOUNTED COMPONENTS

4min
pages 254-258

FIGURE 4-7. CONSOLE BOX ASSEMBLY - PQ CONTROLLERS AND VICKERS VALVE

4min
pages 242-245

FIGURE 4-6. CONSOLE BOX ASSEMBLY - PQ CONTROLLERS AND VICKERS VALVES

3min
pages 238-241

FIGURE 4-3. FIBERGLASS PLATFORM INSTALLATION

1min
pages 230-231

FIGURE 4-2. LOW MOUNT PLATFORM AND FOOTSWITCH INSTALLATIONS

4min
pages 226-229

FIGURE 4-4. ROTATOR MOTOR ASSEMBLY

1min
pages 232-233

FIGURE 4-1. STANDARD PLATFORM AND FOOTSWITCH INSTALLATION

6min
pages 220-225

FIGURE 3-3. TOWER BOOM ASSEMBLIES

4min
pages 212-215

FIGURE 3-2. MAIN BOOM ASSEMBLY

3min
pages 208-211

FIGURE 2-38. GROUND CONTROL BOX INSTALLATION (GAS/DIESEL MACHINES WITH HYDRAULIC BOOM LIMIT SWITCHES BUILT MARCH 1990 TO PRESENT

3min
pages 186-189

FIGURE 3-1. BOOMS AND LIMIT SWITCHES INSTALLATIONS

4min
pages 204-207

FIGURE 2-41. HOODS INSTALLATION (GAS/DIESEL MACHINES BUILT MARCH 1990 THROUGH 1992

1min
pages 198-199

MACHINES

3min
pages 194-197

BUILT MAY 1988 TO PRESENT

3min
pages 182-185

FIGURE 2-36. GROUND CONTROL BOX INSTALLATION (MACHINES WITH ELECTRIC BOOM LIMIT SWITCHES BUILT PRIOR TO MAY 1988 FIGURE 2-37. GROUND CONTROL BOX INSTALLATON (GAS/DIESEL MACHINES WITH HYDRAULIC BOOM LIMIT SWITCHES BUILT MAY 1988 TO MARCH 1990 AND ELECTRIC MACHINES WITH HYDRAULIC BOOM LIMIT SWITCHES

2min
pages 178-181

FIGURE 2-33. TANKS INSTALLATION

6min
pages 168-173

FIGURE 2-28. GENERATOR INSTALLATION (KOHLER) (OPTIONAL

1min
pages 156-157

FIGURE 2-27. DUAL FUEL INSTALLATION - KOHLER

1min
pages 154-155

FIGURE 2-35. OPTIONAL MANUAL DESCENT INSTALLATION

1min
pages 176-177

FIGURE 2-26. KOHLER ENGINE INSTALLATIONS

3min
pages 150-153

FIGURE 2-31. BATTERY CHARGER ASSEMBLY (ELECTRIC POWERED MACHINE

1min
pages 164-165

FIGURE 2-30. PUMP ASSEMBLY - BARNES (KOHLER, KUBOTA AND ELECTRIC POWERED MACHINES

1min
pages 162-163

FIGURE 2-29. ELECTRIC POWERED MACHINES COMPONENTS INSTALLATION

4min
pages 158-161

FIGURE 2-25. THROTTLE AND FUEL SHUT-OFF INSTALLATION (KUBOTA

1min
pages 148-149

FIGURE 2-24. KUBOTA ENGINE INSTALLATION

7min
pages 142-147

FIGURE 2-23. PUMP ASSEMBLY - BARNES (FORD AND DEUTZ POWERED MACHINES

1min
pages 140-141

FIGURE 2-22. GENERATOR INSTALLATION 110 VOLT (DEUTZ) (OPTIONAL

1min
pages 136-139

FIGURE 2-20. GENERATOR INSTALLATION - 110V (FORD) (OPTIONAL

1min
pages 126-129

FIGURE 2-21. DEUTZ ENGINE INSTALLATION

7min
pages 130-135

FIGURE 2-18. DUAL FUEL INSTALLATION (FORD ELECTRONIC IGNITION - PRIOR TO MARCH 1990

1min
pages 122-123

FIGURE 2-14. SWING BRAKE ASSEMBLY

1min
pages 104-105

FIGURE 2-16. FORD ENGINE INSTALLATION - WITH ELECTRONIC IGNITION (PRIOR TO MARCH 1990 FIGURE 2-17. FORD ENGINE INSTALLATION - WITH DISTRIBUTORLESS IGNITION SYSTEM (MARCH 1990 TO PRESENT) ...................................................................................................................................................................................................... 114

17min
pages 108-121

FIGURE 2-15. SWING MOTOR ASSEMBLY

1min
pages 106-107

FIGURE 2-13. TURNTABLE, BEARING AND SWING DRIVE INSTALLATION

3min
pages 100-103

FIGURE 2-12. ACCESSORY VALVE ASSEMBLY (HYDRAFORCE

1min
pages 98-99

FIGURE 2-10. VALVE ASSEMBLY - SINGLE STACK BANG-BANG

1min
pages 94-95

FIGURE 2-9. CONTROL VALVE ASSEMBLY - (VICKERS) (OCTOBER 1994 TO PRESENT

2min
pages 90-93

FIGURE 2-8. CONTROL VALVE ASSEMBLY (VICKERS) (PRIOR TO OCTOBER 1994

2min
pages 86-89

FIGURE 2-7. VALVE ASSEMBLY - FPS

2min
pages 84-85

FIGURE 2-6. VALVE ASSEMBLY - 4 STACK BANG-BANG

2min
pages 80-83

FIGURE 2-5. VALVE ASSEMBLY - FPS (STEER

1min
pages 78-79

FIGURE 1-12. LOCKOUT VALVE ASSEMBLY

1min
pages 58-59

FIGURE 2-4. STEP CONTROL VALVE ASSEMBLY

1min
pages 76-77

FIGURE 2-3. CONTROL VALVES INSTALLATIONS - VICKERS (FORD GAS, DEUTZ DIESEL AND KUBOTA DIESEL

3min
pages 72-75

FIGURE 1-13. TOW PACKAGE INSTALLATION

3min
pages 60-62

FIGURE 1-10. DRIVE MOTOR ASSEMBLY - 4WD

1min
pages 50-53

FIGURE 1-6. DRIVE HUB/BRAKE ASSEMBLIES

5min
pages 34-39

FIGURE 1-9. DRIVE MOTOR ASSEMBLY - 2WD

2min
pages 46-49

FIGURE 1-7. DRIVE BRAKE ASSEMBLY - AUSCO

1min
pages 40-41

FIGURE 1-2. FRAME AND STEERING INSTALLATION - 6FT-6IN/2M 2WD FRAME (WITH DOUBLE ROD CYLINDER

1min
pages 14-17

FIGURE 1-5. DRIVE HUB ASSEMBLIES

5min
pages 28-33

FIGURE 1-1. FRAME AND STEERING INSTALLATION - 5FT-9IN/1.75M 2WD FRAME (WITH SINGLE ROD CYLINDER

2min
pages 10-13

FIGURE 1-4. TIRE AND WHEEL DRIVE INSTALLATIONS

7min
pages 22-27

FIGURE 1-3. FRAME AND STEERING INSTALLATION 6FT-6IN/2M 4WD FRAME

2min
pages 18-21
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
JLG 45HA Parts Manual (3120626) - PDF Download En by www.heydownloads.com - Issuu