JLG 45HA Parts Manual (3120626) - PDF Download En

Page 372

SECTION 10 - SPECIAL OPTIONS FIGURE 10-2. U/L MACHINES SPECIAL OPTIONS

ITEM

PART NUMBER

0251623

QTY Ref Ref Ref Ref Ref Ref Ref Ref

0252530

Ref

0400068 0400077

Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref Ref

0251281 0251282 1281458 0800567 0800708

0239794 1281094 0251284 1281459 0251838 0251419 0251418 0251285 0251280 3160161 1660179 3600142 3600201 3600181 0251283 0254440 0254244 4400325 0251296 0253909

372

DESCRIPTION U/L MACHINES SPECIAL OPTIONS: Batteries Installation (Electric Machines) Boom Installation Boom Installation Tower Boom Assembly (Same as Standard) Main Boom Assembly (Special) Charger Installation Options: Charger Installation Electric Machines (Prior to October 1991) Charger Installation Electric Machines (October 1991 to Present) Electric Machines (Prior to October 1991) Electric Machines (October 1991 to Present) Decal Installations Diesel Machines Diesel Machines Electric Machines Electric Machines Fuse Holder Box Assembly (Electric Machines) Ground Control Box Installation/Assembly (Electric Machines) Ground Control Box Installation/Assembly (Electric Machines) Hood Installation (Electric Machines) Motor and Pump Installation (Electric Machines) Motor, Electric Coupling Pump Assembly (Prior to March 1993) Pump Assembly (March 1993 to Present) Auxiliary Pump Assembly Platform Console Box Assembly (Electric Machines) Receptacle at Platform Installation Static Straps Installation (Electric Machines) Tank Assembly - Hydraulic (Electric Machines) Valves Installation - Vickers Options: Valves Installation Electric Machines Built Through 1992 Valves Installation Electric Machines Built (1993 to Present)

45HA

REV C C C

3120626


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

FIGURE 10-4. JAPANESE MACHINE OPTIONS

1min
page 376

FIGURE 10-3. 440V ELECTRIC PEDESTAL MACHINE SPECIAL OPTIONS

1min
pages 374-375

FIGURE 10-1. SPECIAL OPTIONS LIST

4min
pages 368-371

FIGURE 10-2. U/L MACHINES SPECIAL OPTIONS

1min
pages 372-373

FIGURE 9-2. MODELS 45HA GAS AND DIESEL MACHINES WITH VICKERS VALVES VARIABLE PARTS

1min
page 366

FIGURE 9-1. MODELS 45HA GAS AND DIESEL MACHINES WITH VICKERS VALVES STANDARD PARTS

4min
pages 364-365

FIGURE 7-1. ELECTRICAL DIAGRAM LIST

8min
pages 328-333

FIGURE 8-2. DECALS INSTALLATIONS (45HA AUGUST 1991 TO PRESENT

5min
pages 358-362

FIGURE 8-1. DECALS INSTALLATIONS (45HA PRIOR TO AUGUST 1991

2min
pages 354-357

FIGURE 6-14. HYDRAULIC DIAGRAM LIST

5min
pages 324-326

FIGURE 6-11. TELESCOPE (MAIN BOOM) HYDRAULIC DIAGRAM

1min
pages 318-319

FIGURE 6-12. TELESCOPE (TOWER BOOM) HYDRAULIC DIAGRAM (FORD GAS AND DEUTZ DIESEL

1min
pages 320-321

FIGURE 6-10. SWING HYDRAULIC DIAGRAM (WITH VICKERS VALVES

1min
pages 316-317

FIGURE 6-8. ROTATION HYDRAULIC DIAGRAM

1min
pages 312-313

FIGURE 6-5. LIFT AND SLAVE (MAIN BOOM) HYDRAULIC DIAGRAM

1min
pages 302-303

FIGURE 6-7. PUMP HYDRAULIC DIAGRAM (VICKERS VALVES - ELECTRIC MACHINES

1min
pages 308-311

FIGURE 6-6. PUMP HYDRAULIC DIAGRAM (VICKERS VALVES - FORD GAS AND DEUTZ DIESEL MACHINES

2min
pages 304-307

FIGURE 6-1. HYDRAULIC DIAGRAM - AXLE LOCKOUT

1min
pages 290-291

FIGURE 5-13. TELESCOPE CYLINDER ASSEMBLY (TOWER BOOM) (JULY 1988 TO PRESENT

1min
pages 284-285

FIGURE 5-10. STEER CYLINDER ASSEMBLY (4WD

1min
pages 278-279

FIGURE 5-9. STEER CYLINDER ASSEMBLY (2WD SINGLE ACTING ROD

1min
pages 276-277

FIGURE 5-8. STEER CYLINDER ASSEMBLY (2WD - DOUBLE ACTING ROD

1min
pages 274-275

FIGURE 5-7. PLATFORM LEVEL CYLINDER ASSEMBLY (MAIN BOOM) (OCTOBER 1992 TO PRESENT

1min
pages 272-273

FIGURE 5-4. LIFT CYLINDER ASSEMBLY (MAIN BOOM

1min
pages 266-267

FIGURE 5-3. LEVEL CYLINDER ASSEMBLY (TOWER BOOM

1min
pages 264-265

FIGURE 5-5. LIFT CYLINDER ASSEMBLY (TOWER BOOM

1min
pages 268-269

FIGURE 5-1. ACCUMULATOR ASSEMBLY (MACHINES WITH STEPPER VALVES

1min
pages 260-261

FIGURE 5-2. AXLE LOCKOUT CYLINDER ASSEMBLY

1min
pages 262-263

FIGURE 4-10. OPTIONAL COMMON PLATFORM MOUNTED COMPONENTS

4min
pages 254-258

FIGURE 4-7. CONSOLE BOX ASSEMBLY - PQ CONTROLLERS AND VICKERS VALVE

4min
pages 242-245

FIGURE 4-6. CONSOLE BOX ASSEMBLY - PQ CONTROLLERS AND VICKERS VALVES

3min
pages 238-241

FIGURE 4-3. FIBERGLASS PLATFORM INSTALLATION

1min
pages 230-231

FIGURE 4-2. LOW MOUNT PLATFORM AND FOOTSWITCH INSTALLATIONS

4min
pages 226-229

FIGURE 4-4. ROTATOR MOTOR ASSEMBLY

1min
pages 232-233

FIGURE 4-1. STANDARD PLATFORM AND FOOTSWITCH INSTALLATION

6min
pages 220-225

FIGURE 3-3. TOWER BOOM ASSEMBLIES

4min
pages 212-215

FIGURE 3-2. MAIN BOOM ASSEMBLY

3min
pages 208-211

FIGURE 2-38. GROUND CONTROL BOX INSTALLATION (GAS/DIESEL MACHINES WITH HYDRAULIC BOOM LIMIT SWITCHES BUILT MARCH 1990 TO PRESENT

3min
pages 186-189

FIGURE 3-1. BOOMS AND LIMIT SWITCHES INSTALLATIONS

4min
pages 204-207

FIGURE 2-41. HOODS INSTALLATION (GAS/DIESEL MACHINES BUILT MARCH 1990 THROUGH 1992

1min
pages 198-199

MACHINES

3min
pages 194-197

BUILT MAY 1988 TO PRESENT

3min
pages 182-185

FIGURE 2-36. GROUND CONTROL BOX INSTALLATION (MACHINES WITH ELECTRIC BOOM LIMIT SWITCHES BUILT PRIOR TO MAY 1988 FIGURE 2-37. GROUND CONTROL BOX INSTALLATON (GAS/DIESEL MACHINES WITH HYDRAULIC BOOM LIMIT SWITCHES BUILT MAY 1988 TO MARCH 1990 AND ELECTRIC MACHINES WITH HYDRAULIC BOOM LIMIT SWITCHES

2min
pages 178-181

FIGURE 2-33. TANKS INSTALLATION

6min
pages 168-173

FIGURE 2-28. GENERATOR INSTALLATION (KOHLER) (OPTIONAL

1min
pages 156-157

FIGURE 2-27. DUAL FUEL INSTALLATION - KOHLER

1min
pages 154-155

FIGURE 2-35. OPTIONAL MANUAL DESCENT INSTALLATION

1min
pages 176-177

FIGURE 2-26. KOHLER ENGINE INSTALLATIONS

3min
pages 150-153

FIGURE 2-31. BATTERY CHARGER ASSEMBLY (ELECTRIC POWERED MACHINE

1min
pages 164-165

FIGURE 2-30. PUMP ASSEMBLY - BARNES (KOHLER, KUBOTA AND ELECTRIC POWERED MACHINES

1min
pages 162-163

FIGURE 2-29. ELECTRIC POWERED MACHINES COMPONENTS INSTALLATION

4min
pages 158-161

FIGURE 2-25. THROTTLE AND FUEL SHUT-OFF INSTALLATION (KUBOTA

1min
pages 148-149

FIGURE 2-24. KUBOTA ENGINE INSTALLATION

7min
pages 142-147

FIGURE 2-23. PUMP ASSEMBLY - BARNES (FORD AND DEUTZ POWERED MACHINES

1min
pages 140-141

FIGURE 2-22. GENERATOR INSTALLATION 110 VOLT (DEUTZ) (OPTIONAL

1min
pages 136-139

FIGURE 2-20. GENERATOR INSTALLATION - 110V (FORD) (OPTIONAL

1min
pages 126-129

FIGURE 2-21. DEUTZ ENGINE INSTALLATION

7min
pages 130-135

FIGURE 2-18. DUAL FUEL INSTALLATION (FORD ELECTRONIC IGNITION - PRIOR TO MARCH 1990

1min
pages 122-123

FIGURE 2-14. SWING BRAKE ASSEMBLY

1min
pages 104-105

FIGURE 2-16. FORD ENGINE INSTALLATION - WITH ELECTRONIC IGNITION (PRIOR TO MARCH 1990 FIGURE 2-17. FORD ENGINE INSTALLATION - WITH DISTRIBUTORLESS IGNITION SYSTEM (MARCH 1990 TO PRESENT) ...................................................................................................................................................................................................... 114

17min
pages 108-121

FIGURE 2-15. SWING MOTOR ASSEMBLY

1min
pages 106-107

FIGURE 2-13. TURNTABLE, BEARING AND SWING DRIVE INSTALLATION

3min
pages 100-103

FIGURE 2-12. ACCESSORY VALVE ASSEMBLY (HYDRAFORCE

1min
pages 98-99

FIGURE 2-10. VALVE ASSEMBLY - SINGLE STACK BANG-BANG

1min
pages 94-95

FIGURE 2-9. CONTROL VALVE ASSEMBLY - (VICKERS) (OCTOBER 1994 TO PRESENT

2min
pages 90-93

FIGURE 2-8. CONTROL VALVE ASSEMBLY (VICKERS) (PRIOR TO OCTOBER 1994

2min
pages 86-89

FIGURE 2-7. VALVE ASSEMBLY - FPS

2min
pages 84-85

FIGURE 2-6. VALVE ASSEMBLY - 4 STACK BANG-BANG

2min
pages 80-83

FIGURE 2-5. VALVE ASSEMBLY - FPS (STEER

1min
pages 78-79

FIGURE 1-12. LOCKOUT VALVE ASSEMBLY

1min
pages 58-59

FIGURE 2-4. STEP CONTROL VALVE ASSEMBLY

1min
pages 76-77

FIGURE 2-3. CONTROL VALVES INSTALLATIONS - VICKERS (FORD GAS, DEUTZ DIESEL AND KUBOTA DIESEL

3min
pages 72-75

FIGURE 1-13. TOW PACKAGE INSTALLATION

3min
pages 60-62

FIGURE 1-10. DRIVE MOTOR ASSEMBLY - 4WD

1min
pages 50-53

FIGURE 1-6. DRIVE HUB/BRAKE ASSEMBLIES

5min
pages 34-39

FIGURE 1-9. DRIVE MOTOR ASSEMBLY - 2WD

2min
pages 46-49

FIGURE 1-7. DRIVE BRAKE ASSEMBLY - AUSCO

1min
pages 40-41

FIGURE 1-2. FRAME AND STEERING INSTALLATION - 6FT-6IN/2M 2WD FRAME (WITH DOUBLE ROD CYLINDER

1min
pages 14-17

FIGURE 1-5. DRIVE HUB ASSEMBLIES

5min
pages 28-33

FIGURE 1-1. FRAME AND STEERING INSTALLATION - 5FT-9IN/1.75M 2WD FRAME (WITH SINGLE ROD CYLINDER

2min
pages 10-13

FIGURE 1-4. TIRE AND WHEEL DRIVE INSTALLATIONS

7min
pages 22-27

FIGURE 1-3. FRAME AND STEERING INSTALLATION 6FT-6IN/2M 4WD FRAME

2min
pages 18-21
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
JLG 45HA Parts Manual (3120626) - PDF Download En by www.heydownloads.com - Issuu