BI620114
Service Manual
MAINTENANCE SCHEDULES MAINTENANCE INSPECTIONS
The maintenance inspections are to be carried out by a competent and authorised person. Adhere to site specific rules and regulations. All faults found are to be rectified before the machine is returned to service, if it is not rectified site tagging procedure is to be followed.
Manufacture and site specific isolation procedures must be followed.
The preventative maintenance inspections are to be used in conjunction with a Job Safety Analysis.
If the job sequence changes a new Job Safety Analysis needs to be completed for the changes. Failure to do so may result in personal injury or equipment damage.
Rev. 2
FBL-10 LHD/Utility Serial No. 1600
25