1 minute read

Maintenance Schedules

Next Article
Concrete Hopper

Concrete Hopper

MAINTENANCE SCHEDULES

MAINTENANCE INSPECTIONS

 The maintenance inspections are to be carried out by a competent and authorised person.  Adhere to site specific rules and regulations.  All faults found are to be rectified before the machine is returned to service, if it is not rectified site tagging procedure is to be followed.

Manufacture and site specific isolation procedures must be followed.

The preventative maintenance inspections are to be used in conjunction with a Job Safety Analysis.

If the job sequence changes a new Job Safety Analysis needs to be completed for the changes. Failure to do so may result in personal injury or equipment damage.

This article is from: