BI001519

_______________________________________________________ Operation Shutdown procedures 1. Allow the machine to run until the hopper is empty. Continue to run the machine until all material that has been carried back into the return line has been cleaned out. IMPORTANT! If material is very wet or sticky, it is recommended that the return line be flushed with water and the conveyor be allowed to run and clean out the return line before shutting the machine down. To shutdown the feeder breaker from the starter enclosure: 2. Engage the “PICK BKR STOP” pushbutton located on the starter enclosure to stop the breaker motor. 3. Move the circuit breaker reset switch to the “OFF” position . 4. Move the “TRAM/OFF/CONV” switch to the “OFF” position. 5. Move the “MAN/OFF/AUTO” switch to the “OFF” position. To shutdown the feeder breaker from the radio remote: 2. Move the “PUMP” start/stop toggle switch to the “STOP” position to stop the breaker motor. 3. Move the radio remote “ON/OFF” toggle switch to “OFF”. 4. Move the circuit breaker reset switch, located on the starter enclosure, to the “OFF” position. 5. Move the “TRAM/OFF/CONV” switch located on the starter enclosure to the “OFF” position. 6. Move the “MAN/OFF/AUTO” switch located on the starter enclosure to the “OFF” position. Emergency stop procedures: The machine can also be shutdown in emergency situations using: 1. Either panic strip 2. The “EMERGENCY STOP” button on the starter enclosure 3. The “EMERGENCY STOP” button on the radio remote, or Activating any one of the emergency stop devices will open the master control relay, “MCR”. Power will still be on the machine and the machine can be restarted using normal starting procedures.

______________________________________________________________ A6474X435 REV 2 5.23


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Breaker power unit ....................................................... 5

8min
pages 174-181

Conveyor drive motor ................................................... 5

3min
pages 186-189

TAC monitor for conveyor speed sensor ............. 5

1min
pages 160-161

Crawler track ............................................................... 5

3min
pages 162-164

Lift cylinder ................................................................... 5

2min
pages 193-195

Chain elongation measurement ........................... 5

4min
pages 156-159

Breaker bit removal ...................................................... 5

1min
page 190

Crawler assembly ........................................................ 5

8min
pages 165-173

Main relief pressure ....................................................... 5

1min
page 139

Main pump adjustments ................................................ 5

1min
pages 137-138

Head shaft sprockets ................................................... 5

4min
pages 146-148

Procedure to set Amplifier Card ......................................... 5

2min
pages 128-129

Pressure limiter adjustment ........................................... 5

1min
pages 140-141

Crawler track adjustment .............................................. 5

2min
pages 132-133

Inspection of the fire suppression system .......................... 5

1min
pages 124-125

Breaker drive chain adjustment ..................................... 5

2min
pages 134-135

Every 3 months ............................................................. 5

1min
page 116

Breaker and breaker power unit assembly .................... 5

1min
page 94

Conveyor drive ............................................................. 5

1min
page 92

Monthly ......................................................................... 5

1min
pages 113-115

Major hydraulic components .......................................... 5

3min
pages 82-83

Primary hydraulic circuit ................................................ 5

1min
pages 84-86

Head shaft .................................................................... 5

1min
page 91

Starter enclosure ........................................................... 5

3min
pages 76-79

Electrical system ................................................................. 5

1min
page 73

Shutdown procedure .......................................................... 5

1min
page 67

“AUTO” mode starting procedure ....................................... 5

1min
page 65

Tramming the machine ....................................................... 5

1min
page 68

Conveyor operation ............................................................ 5

3min
pages 69-70

“MANUAL” mode starting procedure .................................. 5

1min
page 66

Dust suppression system .............................................. 5

2min
pages 59-60

Radio remote ................................................................. 5

3min
pages 61-64

Control system operating parameters ................................ 5

2min
pages 71-72
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.