CCNZ National Awards 2021

Page 66

CAT

3

PROJECTS WITH A VALUE OF BETWEEN $5 MILLION AND $20 MILLION

A pathway to success PROJECT: Te Hikoi Ararewa (Wainuiomata Shared Pathway) Stage One and Stage Two CONTRACTOR: Downer NZ CLIENT: Hutt City Council (HCC) VALUE: $12.9m Downer was awarded the contract for Stage 1 of the Wainuiomata Shared Pathway in 2017. The project scope was to construct and deliver a 4-kilometre shared pathway that was 4m wide (3m in constrained areas) alongside the Wainuiomata Hill Road from Rishworth Street to Pukeatua Bridge. This included widening the existing footpaths on Gracefield Road and Bell Road South. Stage 2 was to extend the pathway from the Summit at Pukeatua Bridge

66

towards Wainuiomata, ending at Park Way. This was a $12.9 million project, with Stage 1 being delivered through a successful tender and Stage 2 being secured by offering significant redesign savings to HCC. The design goal forms part of a wider strategic network with future linkages to the Beltway Cycleway (which began construction in July 2020), the Eastern Bay shared Path and the CBD. The overarching goal is improved safety, improved connectivity and increased active lifestyle and recreational choices.

CCNZ / HIREPOOL CONSTRUCTION EXCELLENCE AWARDS 2021


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Fletchers Group

1min
pages 137-138

Fulton Hogan Corporate

1min
page 136

Wynyard Edge Alliance

1min
page 135

Pipeline & Civil

1min
page 131

Downer NZ

1min
page 134

Connexis Civil Industry Training Awards

1min
page 129

Quality Roading and Services

1min
page 133

Z and Connexis judges profiles

3min
pages 126-128

Z People – Emerging Leaders

6min
pages 122-123

Z People – Personal Improvement

4min
pages 124-125

Christchurch City Council Road Maintenance

1min
pages 118-119

Rivers and Drainage Maintenance

1min
pages 120-121

West Coast Network Outcomes Contract

1min
pages 114-115

New Plymouth District Council Contract

1min
pages 112-113

Christchurch Central Road Maintenance

1min
pages 116-117

North Canterbury Transport Infrastructure Recovery

1min
pages 110-111

City Rail Link – Contract 2

1min
pages 108-109

Waikato Expressway Huntly Section

1min
pages 106-107

America’s Cup 36

1min
pages 102-103

Christchurch Northern Corridor

1min
pages 104-105

Snells Algies Wastewater Pipe and Outfall Construction

1min
pages 98-99

National Hockey Centre

1min
pages 100-101

Waipipi Wind Farm Civil Balance of Plant

1min
pages 94-95

Lyttelton Tunnel Deluge & Associated Systems Upgrade

1min
pages 96-97

Pukekohe Wastewater Treatment Plant

1min
pages 92-93

Ngā Puna Wai Sports Hub

1min
pages 90-91

Rotokauri Transport Hub

1min
pages 88-89

Whirokino Trestle and Manawatū River Bridge Replacement

1min
pages 86-87

Peacocke SH3 / Ohaupo Road Roundabout

1min
pages 84-85

Awakeri Wetland Stage 1A

1min
pages 82-83

Christchurch Northern Corridor

1min
pages 78-79

Kaituna River Re-Diversion and Te Awa o Ngātoroirangi / Maketu Estuary Enhancement Project

1min
pages 80-81

Safe Roads SH50: Hawkes Bay Expressway

1min
pages 76-77

Tauhara Geothermal Power Station

1min
pages 74-75

Riccarton Road Upgrade

1min
pages 72-73

Cobham Drive Bay Connection

1min
pages 64-65

Victoria Street Cycleway Project

1min
pages 70-71

Te Hikoi Ararewa Stage One and Two

1min
pages 66-67

Tekapo A New Intake Gate

1min
pages 68-69

Te Maunga Waste Water Treatment Plant

1min
pages 62-63

Papakura Stage 1 Water Treatment Plant

1min
pages 60-61

Mt Albert Sludge Pipeline Repair

1min
pages 58-59

Ara Tuhoro – Puhoi to Warkworth Motorway Project – CN8A Culvert

1min
pages 54-55

Rosedale WWTP Upgrade

1min
pages 50-51

Runway 23L

1min
pages 56-57

Streets for People Stage 2

1min
pages 46-47

Lyttelton to Woolston Pipeline

1min
pages 52-53

Waikawa Marina, Separable Portion 1

1min
pages 48-49

SH4 Reconnection Project

1min
pages 44-45

SH2 Wairoa River Bridge Cycleway Extension

1min
pages 42-43

Marina Terrace Apartments Ground Anchors

1min
pages 40-41

Whangarei Town Basin Playground

1min
pages 34-35

Rodin Cars Test Track Resurfacing

1min
pages 30-31

Te Ora Hou Community Facility Civil Works

1min
pages 32-33

Days Bay Wharf Repair and Refurbishment

1min
pages 38-39

NCTIR SR1/2 Remedial works, Kaikoura

1min
pages 36-37

Webb Block including Dam

1min
pages 28-29

Judges comments on the winners and highly commended entrants in the CCNZ Hirepool Construction Excellence Awards categories 1-6.

13min
pages 6-15

Huntly Rail Platform Upgrade

1min
pages 18-19

Peninsula Connection 7

1min
pages 26-27

Queen Street Stormwater and Wastewater Renewal

1min
pages 16-17

Moa Point Interceptor Rehabilitation – bypass pumping

1min
pages 22-23

AMETI Eastern Busway Retaining Walls

1min
pages 24-25

Silver Stream Bank Reinstatement 2020

1min
pages 20-21

Hirepool judges profiles

2min
pages 4-5
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CCNZ National Awards 2021 by Civil Contractors NZ - Issuu