Gehl TX - 4017 REPAIR MANUAL(53111324) - PDF DOWNLOAD

Page 250

“T2 + T3 TELESCOPES ASSEMBLY” REFIT

1

2

-

The “T3 Telescope refi t” operation should be done. Use sling + hoist ( Item1 ) to insert “ T2 + T3 telescopes ” assembly ( Item 2 ) into T1 telescope ( Item3 ). During this operation, check that the “ T3 retract chain ” goes in smoothly and is always intension. Put “ T2 extend chains ” in T2 centre to ensure that they do not slide on the sides.

5

4

4 3 1 6

-

Position temporary chocks ( Item 4 ) between T1 telescope ( Item 3 ) and T2 telescope ( Item 5 ). This operation protects the right boom and prevents crushing of the “ T3 retraction chain ” ( Item6 ) when shifting sling ( Item1 ) to boom head. 1

3

- Reposition sling ( Item 1 ) to boom head then insert “ T2 + T3 telescopes ” assembly into T1 telescope ( Item 3 ). Comment: - Do not insert T2 + T3 assembly fully into T1. Leave about 30 cm clearance. - Lift the T2 + T3 assembly and take out temporary chocks (Item 4). 34


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Gehl TX - 4017 REPAIR MANUAL(53111324) - PDF DOWNLOAD by www.heydownloads.com - Issuu