TECHNICAL EXPLANATION WALL TO FLOOR DETAILING

WHY THIS IS IMPORTANT? Understanding how the wall and floor are connected is an essential part of the design process. It allows for better communication when designers have some understanding of how it is all put together.

FOR THE WALL:

FOR THE FLOOR:

I have chosen a timber frame stud wall

Levelling screed will be spread

with insulation in between battens

throughout, then LVT flooring will be

and layerings of plasterboard (used

laid (each intallation process will differ

for insulation & thermal effiency) and

slightly depending on the manufactuer).

finishing with plaster paint (using my

Lastly, paruqet skirting is placed to create

chosen wall paint finish).

a finish look.

137 FINAL MAJOR PROJECT

ADM6006


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
ADM6006 FINAL MAJOR PROJECT DOSSIER by Claire Lomax - Issuu