Linkbelt 210-240 X2 SERVICE MANUAL RST-00-00-001LX - PDF DOWNLOAD

Page 664

4-9 Maintenance: Electric Equipment Judgment Procedure 1 Voltage Measurement Procedure Items to prepare • Service connectors • Tester

[1]

Use the service connector (female) (1) and the service connector (male) (2) for voltage measurement.

1

2

[2]

Remove the connector (1) for voltage measurement.

1

61


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

3.Upper Side Pilot Valve (remote control valve

5min
pages 787-791

2.5-way Solenoid Valve Operation Explanation

3min
pages 785-786

5.EPF (Engine Protection Feature

6min
pages 779-784

4.Sensor Trouble Operation Table

1min
pages 777-778

3.Diagnostic Trouble Code (Monitor display

3min
pages 772-776

1.Message Display List

2min
pages 766-767

9.Model Setting

2min
pages 763-764

10.Engine Screen Information Screen Display Details

1min
page 765

8.Anti-Theft Protection Setting

2min
page 762

7.Option Flow Setting

3min
pages 760-761

6.Check the Monitor Switch (monitor switch check screen

3min
pages 758-759

5.CAL (troubleshooting support) Screen

5min
pages 755-757

2.DIAG (trouble diagnosis) Screen

1min
pages 743-744

3.HR (usage log) Screen List

8min
pages 745-751

2.Swing Motor

1min
page 742

Screen Display List 1.CHK (status display) Screen List

11min
pages 732-741

1.Screen Shift

1min
page 731

5.Beacon

4min
pages 728-730

1.Travel Motor

1min
page 723

4.Return Filter Restriction Detected

1min
page 727

2.Regulator

2min
pages 716-718

Options 1.Option Line Control

3min
pages 719-721

1.Hydraulic Pump

2min
pages 714-715

1) Breaker Q control

1min
pages 708-709

2) 2nd crusher

1min
pages 710-711

1.Breaker Circuit (single operation

3min
pages 704-705

4.Second Option Circuit (hydraulic rotation fork

1min
pages 712-713

2.Shuttle Circuit (hydraulic thumb

2min
pages 706-707

2.Heat Circuit (lever in neutral

2min
pages 700-701

2) When arm-out operation stopped

1min
pages 696-697

Retightening torque table

18min
pages 664-689

ISO type

1min
page 656

Increased Horsepower Circuits 1.Arm-In Increased Horsepower Circuit

1min
pages 690-691

7.Pressure Limiter

1min
page 636

1) Arm-out operation

1min
pages 694-695

2.Travel Increased Horsepower Circuit Other Circuits

2min
pages 692-693

Maintenance after first 250 hours for new machine / every 1000 hours from then ON 1.Swing Reduction Gear Oil Replacement

1min
page 660
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.