Hagie Hi-Tractor DTS 8 Operator's Manual 493377 - PDF DOWNLOAD

Page 10

I. SAFETY/DECALS CHEMICAL HANDLING •

Never allow chemicals to come in contact with skin or eyes. Wear protective clothing or respirators as recommended by chemical manufacturer. Store this clothing outside cab so as not to contaminate filtered cab environment. Also, clean your boots to remove soil or other contaminated particles prior to entering cab.

Never pour chemicals into an empty tank, fill tank half full of water first.

Follow chemical manufacturer’s instructions for mixing chemicals.

Dispose of empty chemical containers properly.

Wash spilled chemicals or spray residue from sprayer to prevent corrosion and deterioration.

Select a safe area to fill, flush, calibrate, and clean sprayer where the chemicals will not drift or run off to contaminate people, animals, vegetation, or water supply.

Never place nozzle tips or other parts to one’s lips in an attempt to unclog spray tip.

Do not spray when wind is in excess of chemical manufacturer’s recommended speed.

Store pesticides in their original containers with label intact. Keep them in a separate, locked building.

GENERAL SAFETY •

Keep a fire extinguisher close at all times.

Keep all shields in place.

Keep clear of all moving parts and keep others away when operating.

Do not wear loose fitting clothing that may be blown or drawn into moving parts.

WARNING DECALS


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

APPENDIX 6 FLOW METER MAINTENANCE AND ADJUSTMENT PROCEDURE

1min
pages 248-249

PROCEDURE TO TEST FLOW METER CABLES

1min
page 247

PROCEDURE TO TEST SPEED SENSOR EXTENSION CABLES

1min
pages 246-247

ALTERNATE BY-PASS LINE PLUMBING SYSTEM

2min
pages 244-246

2.CALCULATING "SPEED CAL"

1min
pages 243-244

SPEEDOMETER DRIVE SPEED SENSOR INSTALLATION AND CALIBRATION PROCEDURE

1min
page 242

3.CALCULATING "SPEED CAL"

1min
page 241

2.RIM DRILLING INSTRUCTIONS FOR WHEEL DRIVE SPEED SENSOR MAGNETS

1min
page 240

WHEEL DRIVE SPEED SENSOR INSTALLATION AND CALIBRATION PROCEDURE

1min
page 239

TROUBLESHOOTING GUIDE

3min
pages 236-238

PREVENTIVE MAINTENANCE

1min
page 235

INITIAL SYSTEM FIELD TEST

1min
page 235

INITIAL SYSTEM SET-UP

1min
page 234

CONSOLE PROGRAMMING

15min
pages 220-233

CONSOLE CALIBRATION

3min
pages 216-219

4.MOUNTING THE CONSOLE AND CABLING

1min
page 213

INSTALLATION

2min
pages 210-212

INTRODUCTION

1min
page 209

RAVEN INDUSTRIES LIMITED WARRANTY

1min
page 205

XI. LIMITED WARRANTY

1min
pages 116, 119, 122-123

X. TROUBLE SHOOTING

1min
page 113

IX. STORAGE

1min
page 106

IX. STORAGE

1min
page 105

VIII. SERVICE AND MAINTENANCE

1min
page 103

VIII. SERVICE AND MAINTENANCE

1min
page 102

VIII. SERVICE AND MAINTENANCE

1min
page 101

VIII. SERVICE AND MAINTENANCE

1min
page 100

VIII. SERVICE AND MAINTENANCE

1min
page 99

VIII. SERVICE AND MAINTENANCE

1min
page 98

VIII. SERVICE AND MAINTENANCE

1min
page 97

VIII. SERVICE AND MAINTENANCE

1min
page 96

VIII. SERVICE AND MAINTENANCE BELTS

1min
page 95

VIII. SERVICE AND MAINTENANCE

1min
page 93

VIII. SERVICE AND MAINTENANCE

1min
page 92

VIII. SERVICE AND MAINTENANCE

1min
pages 90-91

VIII. SERVICE AND MAINTENANCE

1min
page 88

VIII. SERVICE AND MAINTENANCE

1min
page 87

VIII. SERVICE AND MAINTENANCE

1min
page 86

VIII. SERVICE AND MAINTENANCE

1min
page 85

VIII. SERVICE AND MAINTENANCE

1min
pages 83-84

VIII. SERVICE AND MAINTENANCE

1min
page 82

VIII. SERVICE AND MAINTENANCE

1min
page 81

VIII. SERVICE AND MAINTENANCE

1min
page 80

VIII. SERVICE AND MAINTENANCE

1min
page 79

VIII. SERVICE AND MAINTENANCE

1min
page 78

VII. TRANSPORTING

2min
pages 72-73

VI. CALIBRATION

1min
page 71

VI. CALIBRATION

1min
page 70

V. OPERATING INFORMATION

1min
page 69

V. OPERATING INFORMATION

1min
page 68

V. OPERATING INFORMATION

1min
page 67

V. OPERATING INFORMATION

1min
page 66

V. OPERATING INFORMATION

1min
page 65

V. OPERATING INFORMATION

1min
page 64

V. OPERATING INFORMATION

1min
page 63

V. OPERATING INFORMATION

1min
page 60

V. OPERATING INFORMATION

1min
page 58

V. OPERATING INFORMATION

1min
page 57

V. OPERATING INFORMATION

1min
page 56

V. OPERATING INFORMATION

1min
page 55

V. OPERATING INFORMATION

1min
page 53

V. OPERATING INFORMATION

1min
page 52

V. OPERATING INFORMATION

1min
page 50

V. OPERATING INFORMATION

1min
page 49

V. OPERATING INFORMATION

1min
page 47

V. OPERATING INFORMATION

1min
page 46

V. OPERATING INFORMATION

1min
page 45

V. OPERATING INFORMATION

1min
page 44

V. OPERATING INFORMATION

1min
page 43

V. OPERATING INFORMATION

1min
page 41

V. OPERATING INFORMATION

1min
page 36

V. OPERATING INFORMATION

1min
page 35

V. OPERATING INFORMATION

1min
page 34

V. OPERATING INFORMATION

1min
page 33

V. OPERATING INFORMATION

1min
page 32

V. OPERATING INFORMATION

1min
page 31

V. OPERATING INFORMATION

1min
page 30

IV. PREPARING TO OPERATE

1min
page 26

IV. PREPARING TO OPERATE

1min
page 25

I. SAFETY/DECALS

1min
pages 10-11

I. SAFETY/DECALS

1min
page 9

I. SAFETY/DECALS OPERATING

1min
page 8

I. SAFETY/DECALS SAFETY PRECAUTIONS

1min
page 7

TO THE OPERATOR

1min
page 5
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.