Case 595SLE & 595LSP Loader Backhoe Operator's Manual 6-8940 - PDF DOWNLOAD

Page 160

OPERATING INSTRUCTIONS

PARKING THE MACHINE Template Name: OM_1_col Template Date: 1994_04_29

STEP 1

STEP 5

Park the machine on a flat, level surface away from any soft ground or excavations.

Stop the engine, remove the starter switch key and release the hydraulic pressure. See “Releasing the pressure in the hydraulic system” in the “Lubrication/Filters/Fluids”.

STEP 2 Lower the loader bucket to the ground.

STEP 6

STEP 3

Lock the operator's compartment doors.

Engage the parking brake and place the direction of travel control lever and gear change lever in neutral position. STEP 4

TRIM THIS EDGE

Place the backhoe attachment in the road travel position. See "Setting the backhoe attachment in the road travel position”.

STEP 7 Disconnect the electrical system by means of the battery master switch key. STEP 8 If the machine is parked outdoors, cover the exhaust pipe so as to protect the engine against damp.

!

WARNING : Check that no part of the machine is protruding onto the public highway. If this cannot be avoided, install signs in accordance with regulations.

Alt= to hide template information Alt+ to display template information 158

TRIM THIS EDGE LEFT PAGE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Case 595SLE & 595LSP Loader Backhoe Operator's Manual 6-8940 - PDF DOWNLOAD by www.heydownloads.com - Issuu