20
Facilities & Maintenance The Facilities Maintenance Department had a busy year maintaining all the city facilities and their improvements. It has been two years since the work order system, Assets Essentials, has been implemented, and there has been a significant increase in the Facilities Maintenance team’s efficiency and productivity. The Facilities Team has acquired state of the art equipment which will assist in maintaining this high level of productivity. The team also completed a year of preventative maintenance on many critical systems within the city facilities, i.e. plumbing, HVAC, general construction, and electrical systems, and furthermore, have seen a decrease in the number of scheduled and non-scheduled repairs in which the life expectancy of these systems are extended. Facilities had numerous grand openings, ground breakings and a variety of projects with renovations to various facilities and structures.
Director of Administrative Services: Juan Fuentes Project & Facility Director: Trent Moore
• • • • •
Upgrades kitchen equipment and facilities Everything was replaced and new Updated waiting area in the lounge Installed granite tops Converted the existing space into a modernized lounge area to serve citizens and all those who travel through our air center. • The project was increased from its original conservative concept to provide a higher quality of service for our citizens and passengers at the airport • The project has taken approx. completed in mid- January of 2020. Substantial completion was the 20th of December.
Roofs
Major Project • 8 major roofs projects and renovations in project and two smaller scale renovations with a total of $2,664,854.63 Facilities • Buildings: Hanger 84 and 85, Roswell Air Work Order System Terminal, International Law Enforcement • 1,612 work orders completed for 2019 out of Training Center, Aersale, office building 92, 135 sites. Total of 11,340.77 man hours aersale manufacturing building 118, • Work orders ranged: from remodel of aersale storage building 240, Public Health wastewater treatment breakroom, re-doing Department, Roswell Animal Control flooring in City Hall, other examples would be re-touching paint. City Hall Elevator Modernization • 81% efficiency with 7 employees • Project was 111 thousand 416. 25 • Much needed for staff and citizens Flight Lounge • The project removed all of the existing • $350,000 approximately elevator hardware and components • Complete remodel of the kitchen and lounge and replaced it with newer hardware. Added area in the RIAC