Liebherr ER 954 C High-Rise 1380 Hydraulic Excavator Operating Manual SN 32643 - PDF DOWNLOAD

Page 94

Control and operation

Operating manual

Operating and control elements

Overload warning device (optional equipment) For a machine fitted with the optional equipment "overload warning device", and if this equipment has been turned on via the switch S18, this symbol alerts the operator that the load limit of the machine has been reached At the same time the buzzer sounds to alert the operator to this fact. No overload warning device recognized This symbol appears if switching on the overload warning device via switch S18 though no overload warning device has been installed and/or correctly initialised on the machine. Warm up procedure This symbol appears during a warm up procedure of the hydraulic oil. Working pumps swivelled back to minimum delivery

3.1.6

Information provided in the menus Menu selection from main screen:

Fig. 3-10

Main screen

To change to the list of menus, the main screen must be visible. With the main screen visible, press the Menu key of the display. The list of accessible menus is displayed.

Fig. 3-11

List of menus

copyright by

3 - 18

MJFCIFSS

ER 954 C - High-Rise / 11211691


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

5Maintenance

1hr
pages 229-232, 234-313

4Malfunctions

10min
pages 217-225

Control and operation

4min
pages 210-211, 213-216

Control and operation

8min
pages 198-209

Control and operation

3min
pages 194-197

Control and operation

1min
pages 192-193

Control and operation

1min
pages 190-191

Control and operation

2min
pages 188-189

Control and operation

1min
pages 186-187

Control and operation

3min
pages 184-185

Control and operation

1min
pages 182-183

Control and operation

1min
pages 180-181

Control and operation

1min
pages 178-179

Control and operation

11min
pages 168-177

Control and operation

2min
pages 166-167

Control and operation

11min
pages 156-165

Control and operation

1min
pages 154-155

Control and operation

4min
pages 148-153

Control and operation

2min
pages 146-147

Control and operation

1min
pages 144-145

Control and operation

1min
pages 142-143

Control

3min
pages 138-141

Control and operation

12min
pages 126-137

Control and operation

2min
pages 124-125

Control and operation

1min
pages 122-123

Control and operation

10min
pages 110-121

Control and operation

3min
pages 108-109

Control and operation

1min
pages 106-107

Control and operation

2min
pages 104-105

Control and operation

1min
pages 102-103

Control and operation

2min
pages 100-101

Control and operation

1min
pages 98-99

Control and operation

3min
pages 94-97

Control and operation

6min
pages 90-93

Control and operation

2min
pages 86-89

Control and operation

1min
pages 84-85

Control and operation

1min
pages 82-83

Control and operation

1min
pages 78-79

Safety instructions, Signs on the machine

1min
pages 72-75

Safety instructions, Signs on the machine

6min
pages 64-69

Safety instructions, Signs on the machine

4min
pages 62-63

2Safety instructions, Signs on the machine

33min
pages 45-61

1Product description

1min
pages 9-14, 41
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.