Liebherr ER 954 C High-Rise 1380 Hydraulic Excavator Operating Manual SN 32643 - PDF DOWNLOAD

Page 152

Control and operation

Operating manual

Setting the machine into operation

Check the controls function Move the safety lever to the down position. Check the controls function: carefully operate the joysticks and pedals. Check the slewing gear brake is functioning correctly.

Preheating of the hydraulic system If the hydraulic oil temperature is below 8 °C: current warm up phase is displayed. As soon the hydraulic oil temperature rises above 8 °C, the full power of the machine is available. Note The warm up phase for the hydraulic circuit can be activated and deactivated at the display.

Starting procedure failure If the motor does not start: Wait for at least 10 minute before the next attempt to start the motor. If the motor is cold: try maximun 3 starts. If the motor is warm: try maximun 2 starts. If there are two unsuccessful attempts to start the motor, establish the cause of the fault and eliminate it.

3.3.4

Shutting down the machine

2 buttons

Fig. 3-59

Buttons in right armrest

copyright by

3 - 62

MJFCIFSS

ER 954 C - High-Rise / 11211691


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Troubleshooting

1hr
pages 260-347

4Troubleshooting

11min
pages 249-259

Control and operation

1min
pages 246-248

Control and operation

1min
pages 244-245

Control and operation

1min
pages 240-241

Control and operation

1min
pages 238-239

Control and operation

7min
pages 226-237

Control and operation

5min
pages 220-225

Control and operation

3min
pages 216-219

Control and operation

5min
pages 208-215

Control and operation

9min
pages 198-207

Control and operation

3min
pages 194-197

Control and operation

6min
pages 188-193

Control and operation

1min
pages 186-187

Control and operation

5min
pages 178-185

Control and operation

3min
pages 174-177

Control and operation

1min
pages 172-173

Control and operation

1min
pages 170-171

Control and operation

1min
pages 160-161

3.4Working with the machine

1min
pages 158-159

Control and operation

5min
pages 152-157

Control and operation

1min
pages 150-151

Control and operation

6min
pages 142-149

Control and operation

4min
pages 134-141

Control and operation

4min
pages 128-133

Control and operation

4min
pages 124-127

Control and operation

3min
pages 120-123

Control and operation

1min
pages 118-119

Control and operation

1min
pages 116-117

Control and operation

1min
pages 114-115

Control and operation

1min
pages 112-113

Control and operation

3min
pages 108-111

Control and operation

5min
pages 104-107

Control and operation

2min
pages 100-103

Control and operation

1min
pages 98-99

Control and operation

1min
pages 96-97

Control and operation

1min
pages 92-93

Safety instructions, Signs on the machine

1min
pages 86-89

Safety instructions, Signs on the machine

18min
pages 64-83

Safety instructions, Signs on the machine

4min
pages 60-63

2Safety instructions, Signs on the machine

3min
pages 57-59

1Product description

1min
pages 9-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.