Case 9013 Crawler Excavator Operator's Manual 6-6751 GB - PDF DOWNLOAD

Page 90

OPERATING INSTRUCTIONS

CK98M014 CK98M014

Turn the starter switch key to “ON” position and check the instrument console lamps.

Turn the starter switch key to “HEAT” position and hold it there until the audible alarm device sounds.

(In cold weather)

TRIM THIS EDGE

IMPORTANT: Never hold the key in heat position for more than 30 seconds.

Alt= to hide template information Alt+ to display template information

(In cold weather)

STEP 5

87

TRIM THIS EDGE RIGHT PAGE

Template Name: OM_1_col Template Date: 1994_04_29

CP98N005

In cold weather, the message “Eng. pre heat” appears on the systems display panel. See item 11 under “Systems display panel” in the “Controls/Instruments/ Accessories” Section.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Case 9013 Crawler Excavator Operator's Manual 6-6751 GB - PDF DOWNLOAD by www.heydownloads.com - Issuu