City of Roswell 2021 Annual Report

Page 25

Engineering Department Director of Administrative Services Juan Fuentes

The Department Performed. . . • • • • • • • •

City Engineer Louis Najar

Surveying Design Construction Estimates Materials Testing Construction Management Mapping Drawings And More!

ADA ramp at RAC

2021 was Busy. . .

Our Annual Maintenance Project completed 49 work orders in the amount of $589,118. Work orders were for parking, drainage, sidewalk repairs, curb repairs pavement repairs, ADA ramps and more. Engineering also provided a sidewalk in compliance with Americans with Disabilities Act. Throughout the year, this work included upgrade of 28 ADA ramps. This is part of keeping in line with Federal ADA Transitional initiatives. Engineering also funded the installation of Main St. benches and benches at Cielo Grande Park. We also responded to site triangle reviews, signage complaints, and other citizen traffic complaints. City Engineering is the City’s in-house professional services consultant. Engineering works jointly with Streets Department, Special Electronics Department, Water Maintenance & Transmission Department, Sewer Department, Solid Waste Department and Facilities Maintenance Department on a regular basis.

New bench at Cielo Grande Park

Traffic Speed Studies. . .

Engineering also performed traffic/speed studies. The traffic counter tubes and/or radar speed signs were used and the total traffic count and speed limits were extracted from the data collectors.

Some of the locations were: • • •

N. Sycamore @ 2nd St. N. Grand St. Frazier St.

• • •

W. Alameda St. W. 8th St. Pecan St.

Total traffic count & speed limits were extracted from the data collectors

25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
City of Roswell 2021 Annual Report by City of Roswell - Official - Issuu