
1 minute read
Central Control
Water Production. . .
We produced 4,103,381,000 gallons of water in 2021. The chart to the right shows the past six years of water production.
Produced nearly 200k gallons less than 2020
Director of Administrative Services
Juan Fuentes
Utility Director
Lorenzo Sanchez
Water Production Superintendent
Jesus Talamantes
Water Produced (Gallons)
Production Well VFD’s. . .
We are in the process of upgrading our water production wells with all new equipment, including VFD’s (Variable Frequency Drives), which will minimize system pressure and reduce line breaks in the city’s water system. Wells 12 and 15 were completed in 2021.
The cost for these VFD project’s was
$510,000.

Well 12 that was upgraded

RAC Well #1:
RAC Well #1 upgrade started in 2021, and the upgrade is projected to be completed by the end of 2022. Once completed, the estimated cost for upgrading this well is $268,000.