
2 minute read
Engineering
Engineering Department
Director of Administrative Services City Engineer
Juan Fuentes Louis Najar
The Department Performed. . .
• Surveying • Design • Construction Estimates • Materials Testing • Construction Management • Mapping • Drawings • And More!
ADA ramp at RAC
2021 was Busy. . .
Our Annual Maintenance Project completed 49 work orders in the amount of $589,118. Work orders were for parking, drainage, sidewalk repairs, curb repairs pavement repairs, ADA ramps and more.
Engineering also provided a sidewalk in compliance with Americans with Disabilities Act.
Throughout the year, this work included upgrade of 28 ADA ramps. This is part of keeping in line with Federal ADA Transitional initiatives.
Engineering also funded the installation of Main St. benches and benches at Cielo Grande Park.
We also responded to site triangle reviews, signage complaints, and other citizen traffic complaints. City Engineering is the City’s in-house professional services consultant. Engineering works jointly with Streets Department, Special Electronics Department, Water Maintenance & Transmission Department, Sewer Department, Solid Waste Department and Facilities Maintenance Department on a regular basis.
Traffic Speed Studies. . .
Engineering also performed traffic/speed studies. The traffic counter tubes and/or radar speed signs were used and the total traffic count and speed limits were extracted from the data collectors.
Some of the locations were:
• N. Sycamore @ 2nd St. • N. Grand St. • Frazier St. • W. Alameda St. • W. 8th St. • Pecan St.

New bench at Cielo Grande Park


Boys & Girls Club improvements – $1,154,479
Other Project Costs:
• 2021 Sewer Manhole Project $248,071 • Micro-surfacing of previously listed Hot Recycle
Work $507,063 • Spring River Trail Phase One $166,697 • 2021 Large Diameter Valves $1,666,029 • N. Main (US 285) Pavement Maintenance from
College Blvd, north to Country Club Rd: $393,603 • E. College Pavement Maintenance from Main St (US 285) to Atkinson Ave (SR 256) $352,499 • N. Atkinson Pavement Maintenance from College
Blvd. North to Tierra Berrenda $458,920
All Projects of 2021. . .
Engineering was the responsible unit for the design and construction management on behalf of the City of Roswell for $13,562,223 worth of projects completed in 2021.
These projects were funded through multiple sources: City Funding, Water Loans, Legislative Grants, NMDOT and CDBG programs.

19th St. – Main (US 285) to Union Ave. – $600,107


RAC Water Towers – $6,950,304