Grove Crane TMS800E Operator's Manual 132-03 - PDF DOWNLOAD

Page 93

TMS800E OPERATOR’S MANUAL

SET-UP AND INSTALLATION

1.

Lower boom below horizontal.

6.

2.

Attach tag line to stinger nose Figure 4-35.

Using tag line to control movement of stinger, swing stinger into stowed position Figure 4-38.

1

FIGURE 4-38

6642-29

FIGURE 4-35

6642-23

3.

Disconnect LMI connection (1, Figure 4-36). Stow the cable in the 23 ft (7 m) section.

7.

Raise boom slightly above horizontal.

8.

Connect stowage link (1, Figure 4-39) to stinger using pin (2) and retainer clip (3).

2 1

3

6642-28

4.

6642-24

1

FIGURE 4-39

FIGURE 4-36

Remove retainer clip and remove the left side stinger retaining pin (1, Figure 4-37). Place pin in holder.

9.

Remove tag line from stinger.

33 ft (10.1 m) Boom Extension 1.

Lower boom and secure tag line (1, Figure 4-40) to tip of boom extension. shows the 7 m (23 ft) and 10.1 m (33 ft) extension together.

1

6642-26

FIGURE 4-37 6642-30

5.

Raise boom to slightly above horizontal.

GROVE

Published 12-23-2008, Control # 132-03

1

FIGURE 4-40

4-17

4


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

TMS800E OPERATOR’S MANUALLUBRICATION

1min
pages 121-122

OPERATOR’S MANUALLUBRICATION

4min
pages 117-118

TMS800E OPERATOR’S MANUALSET-UP AND INSTALLATION

4min
pages 111, 113-115

TMS800E OPERATOR’S MANUALSET-UP AND INSTALLATION

12min
pages 101-110

TMS800E OPERATOR’S MANUALSET-UP AND INSTALLATION

8min
pages 93-100

TMS800E OPERATOR’S MANUALSET-UP AND INSTALLATION

1min
pages 91-92

TMS800E OPERATOR’S MANUALSET-UP AND INSTALLATION

1min
pages 89-90

INSTALLING THE BI-FOLD MANUAL BOOM EXTENSION

5min
pages 85-88

TMS800E OPERATOR’S MANUALSET-UP AND INSTALLATION

5min
pages 79-84

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

4min
pages 73-75, 77-78

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

4min
pages 71-72

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

4min
pages 69-70

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

5min
pages 67-68

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

9min
pages 61-66

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

3min
pages 59-60

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

5min
pages 57-58

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

4min
pages 55-56

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

7min
pages 49, 52-54

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

14min
pages 43-48

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

5min
pages 39, 41-42

TMS800E OPERATOR’S MANUALOPERATING CONTROLS AND PROCEDURES

6min
pages 37-38

GROVE

46min
pages 1-3, 6, 8-33
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.