Cat FB110 Feeder Breaker Operation & Maintenance Manual (7MFBHM-48DD) – PDF DOWNLOAD

Page 73

___________________________________________________ Operation Shutdown procedure There are several methods of shutting down the feeder breaker.  Allow the machine to run until the hopper is empty. Continue to run the machine until all material that has been carried back into the return line has been cleaned out. IMPORTANT! If material is very wet or sticky, it is recommended that the return line be flushed with water and the conveyor be allowed to run and clean out the return line before shutting the machine down. To shutdown the feeder breaker in “REGULAR”mode:  Engage the “PICK BREAK STOP”pushbutton located on the starter enclosure. This will stop the pick break motor and the pump motor.  Turn the circuit breaker reset switch to the “OFF”position .

To stop the pump motor only while in “REGULAR”mode:  Engage the “PUMP MOTOR STOP”pushbutton located on the starter enclosure. This will stop the pump motor.  Turn the circuit breaker reset switch to the “OFF”position .

To shutdown the feeder breaker in “TRAM ONLY”mode:  Engage the “PUMP MOTOR STOP”pushbutton located on the started enclosure. This will stop the pump motor.  Turn the circuit breaker reset switch to the “OFF”position .

______________________________________________________________ A6474X320 VLSV/00 5.19


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Tailpiece steering cylinder............................................5

8min
pages 203-210

Troubleshooting.................................................................5

1min
page 211

Tilt cylinder ...................................................................5

1min
pages 197-198

Lift cylinder ...................................................................5

2min
pages 199-200

Tailpiece tilt cylinder.....................................................5

1min
pages 201-202

Roof cylinder ................................................................5

1min
pages 193-194

Foot cylinder.................................................................5

2min
pages 195-196

Breaker bit removal......................................................5

1min
page 188

Tailpiece installation.....................................................5

5min
pages 189-192

Conveyor power unit ....................................................5

6min
pages 181-187

Crawler track ...............................................................5

3min
pages 162-164

Crawler assembly ........................................................5

9min
pages 165-172

Breaker shaft and breaker power unit .........................5

9min
pages 173-180

Tail shaft ......................................................................5

5min
pages 154-158

Head shaft sprockets .................................................... 5

4min
pages 151-153

Flow control valve adjustment....................................... 5

2min
pages 145-146

Dual relief valve manifold adjustment ........................... 5

3min
pages 140-142

Secondary valve bank adjustment................................ 5

1min
pages 143-144

Hydrostatic pump charge pressure adjustment.............5

5min
pages 135-137

Hydrostatic pump relief valve adjustment......................5

1min
pages 133-134

Under speed sensor calibration.....................................5

2min
pages 131-132

Every 3 months .............................................................5

2min
pages 115-117

Crawler track adjustment ..............................................5

2min
pages 129-130

Inspection of the feeder .....................................................5

1min
page 121

Every 6 months .............................................................5

1min
pages 119-120

Lubrication and inspection ............................................5

2min
pages 104-105

Major hydraulic components ....................................5

6min
pages 86-90

Breaker and breaker power unit assembly....................5

1min
pages 95-96

Tailpiece assembly........................................................5

1min
pages 97-98

Hydraulic system ................................................................5

1min
page 85

Conveyor ............................................................................5

1min
page 74

Infrared pump motor controls .............................................5

1min
pages 75-76

“REGULAR”mode starting procedure................................5

1min
page 71

Chapter 6: Technical data............................................. 2

5min
pages 80-84

“TRAM ONLY”mode starting procedure............................5

1min
page 72

Starter enclosure ...........................................................5

1min
page 68

Shutdown procedure ..........................................................5

1min
page 73

Electrical system.................................................................5

1min
page 77
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.