____________________________________ Replacement of wear parts How to assemble the crawler track pads To assemble the crawler track pads proceed as follows (Fig. 87):  Lay crawler track pads on a clean flat surface.  Align pads with chain connecting holes centered.  Insert connector into center of crawler pad connecting holes.  Drive T-pin through connecting pin and bend end to secure.  Repeat above procedure for remainder of crawler pads.

How to remove the crawler track pad assembly

© BUCYRUS AMERICA, INC.

To remove the crawler track pad assembly proceed as follows (Fig. 87):  Raise complete crawler assembly off ground and securely block under the machine. The machine must be securely supported off the ground with the crawler free to turn. WARNING! You could be seriously injured or even killed by falling loads. Observe the safe working load of the lifting devices and keep a safe distance away from suspended loads.  Crawler track tension must be released (see Crawler track adjustment in this chapter).  Separate the crawler pads. To separate the crawler pads proceed as follows (Fig. 87) IMPORTANT! Heating or cutting connections with a torch or chisel may be required to ease the removal of T- pins.  Drive or cut T-pin from crawler pad connection using hammer and punch.  Separate crawler track assembly.  Connect an additional pulling or lifting device (e.g. winch or lifting tackle with adequate load limit) to either end of the crawler track assembly and slowly pull the crawler track completely out from under the machine.

______________________________________________________________ A6474X320 VLSV/00 5.111


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Tailpiece steering cylinder............................................5

8min
pages 203-210

Troubleshooting.................................................................5

1min
page 211

Tilt cylinder ...................................................................5

1min
pages 197-198

Lift cylinder ...................................................................5

2min
pages 199-200

Tailpiece tilt cylinder.....................................................5

1min
pages 201-202

Roof cylinder ................................................................5

1min
pages 193-194

Foot cylinder.................................................................5

2min
pages 195-196

Breaker bit removal......................................................5

1min
page 188

Tailpiece installation.....................................................5

5min
pages 189-192

Conveyor power unit ....................................................5

6min
pages 181-187

Crawler track ...............................................................5

3min
pages 162-164

Crawler assembly ........................................................5

9min
pages 165-172

Breaker shaft and breaker power unit .........................5

9min
pages 173-180

Tail shaft ......................................................................5

5min
pages 154-158

Head shaft sprockets .................................................... 5

4min
pages 151-153

Flow control valve adjustment....................................... 5

2min
pages 145-146

Dual relief valve manifold adjustment ........................... 5

3min
pages 140-142

Secondary valve bank adjustment................................ 5

1min
pages 143-144

Hydrostatic pump charge pressure adjustment.............5

5min
pages 135-137

Hydrostatic pump relief valve adjustment......................5

1min
pages 133-134

Under speed sensor calibration.....................................5

2min
pages 131-132

Every 3 months .............................................................5

2min
pages 115-117

Crawler track adjustment ..............................................5

2min
pages 129-130

Inspection of the feeder .....................................................5

1min
page 121

Every 6 months .............................................................5

1min
pages 119-120

Lubrication and inspection ............................................5

2min
pages 104-105

Major hydraulic components ....................................5

6min
pages 86-90

Breaker and breaker power unit assembly....................5

1min
pages 95-96

Tailpiece assembly........................................................5

1min
pages 97-98

Hydraulic system ................................................................5

1min
page 85

Conveyor ............................................................................5

1min
page 74

Infrared pump motor controls .............................................5

1min
pages 75-76

“REGULAR”mode starting procedure................................5

1min
page 71

Chapter 6: Technical data............................................. 2

5min
pages 80-84

“TRAM ONLY”mode starting procedure............................5

1min
page 72

Starter enclosure ...........................................................5

1min
page 68

Shutdown procedure ..........................................................5

1min
page 73

Electrical system.................................................................5

1min
page 77
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.