Cat FB110 Feeder Breaker Operation & Maintenance Manual (7MFBHM-48DD) – PDF DOWNLOAD

Page 145

_______________________________________ Adjustment procedures Secondary valve bank relief adjustment The secondary valve bank (Fig. 77) is fitted with a relief in the inlet section. The designed setting is 2,250 psi.  Two people are required to adjust the pressure setting. One person must operate the foot cylinder valve handle on the secondary valve bank and adjust the relief valve cartridge. The second person will relay pressure gauge readings to the mechanic making the adjustment and will be ready to shutdown the machine via the panic bar, if necessary. WARNING! Two people are required to adjust the pressure setting. One person must operate a stabilizer cylinder valve handle and adjust the relief. The second person must remain at the panic bar at all times during the adjustment procedure. Failure to do so may result in serious injury or death.  Measure the setting of cartridge by fully retracting (deadheading) the foot cylinders, then reading the pressure on “AUXILIARY PRESSURE #3”gauge while the cylinder is deadheaded. The reading should be 2,250 psi. WARNING! Use caution when retracting foot cylinders. When tension is release off of the belt pulley, the feeder breaker may lurch forward. Make sure all personnel are clear of the machine when performing this procedure.  Loosen the jam nut on the relief cartridge by turning out (ccw).  Turn the adjustment screw in (cw) to increase the setting and out (ccw) to decrease the setting.  Once the correct setting is obtained, tighten the jam nut by turning in (cw) while holding the adjustment screw in place.

______________________________________________________________ A6474X320 VLSV/00 5.91


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Tailpiece steering cylinder............................................5

8min
pages 203-210

Troubleshooting.................................................................5

1min
page 211

Tilt cylinder ...................................................................5

1min
pages 197-198

Lift cylinder ...................................................................5

2min
pages 199-200

Tailpiece tilt cylinder.....................................................5

1min
pages 201-202

Roof cylinder ................................................................5

1min
pages 193-194

Foot cylinder.................................................................5

2min
pages 195-196

Breaker bit removal......................................................5

1min
page 188

Tailpiece installation.....................................................5

5min
pages 189-192

Conveyor power unit ....................................................5

6min
pages 181-187

Crawler track ...............................................................5

3min
pages 162-164

Crawler assembly ........................................................5

9min
pages 165-172

Breaker shaft and breaker power unit .........................5

9min
pages 173-180

Tail shaft ......................................................................5

5min
pages 154-158

Head shaft sprockets .................................................... 5

4min
pages 151-153

Flow control valve adjustment....................................... 5

2min
pages 145-146

Dual relief valve manifold adjustment ........................... 5

3min
pages 140-142

Secondary valve bank adjustment................................ 5

1min
pages 143-144

Hydrostatic pump charge pressure adjustment.............5

5min
pages 135-137

Hydrostatic pump relief valve adjustment......................5

1min
pages 133-134

Under speed sensor calibration.....................................5

2min
pages 131-132

Every 3 months .............................................................5

2min
pages 115-117

Crawler track adjustment ..............................................5

2min
pages 129-130

Inspection of the feeder .....................................................5

1min
page 121

Every 6 months .............................................................5

1min
pages 119-120

Lubrication and inspection ............................................5

2min
pages 104-105

Major hydraulic components ....................................5

6min
pages 86-90

Breaker and breaker power unit assembly....................5

1min
pages 95-96

Tailpiece assembly........................................................5

1min
pages 97-98

Hydraulic system ................................................................5

1min
page 85

Conveyor ............................................................................5

1min
page 74

Infrared pump motor controls .............................................5

1min
pages 75-76

“REGULAR”mode starting procedure................................5

1min
page 71

Chapter 6: Technical data............................................. 2

5min
pages 80-84

“TRAM ONLY”mode starting procedure............................5

1min
page 72

Starter enclosure ...........................................................5

1min
page 68

Shutdown procedure ..........................................................5

1min
page 73

Electrical system.................................................................5

1min
page 77
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Cat FB110 Feeder Breaker Operation & Maintenance Manual (7MFBHM-48DD) – PDF DOWNLOAD by www.heydownloads.com - Issuu