Cat FB110 Feeder Breaker Operation & Maintenance Manual (7MFBHM-48DD) – PDF DOWNLOAD

Page 121

________________________________________________ Maintenance tram reducer

Change oil in the tram reducer (Fig. 68).  Clean all dirt and debris from and around the level and fill plugs.  Rotate reducer until drain plug is at the 6 o’ clock position and remove drain plug and allow the oil to completely drain.  Clean and reinstall drain plug.  Rotate reducer until plugs are at the 12 o’ clock and 3 o’ clock positions.  Add oil (80W-90) through the fill hole until fluid begins to flow from the check plug.  When filling the reducer, allow enough time for all cavities inside the reducer to fill.  Install level and fill plugs.  Do not overfill reducer. Fig. 68: Tram reducer oil change

Fill plug location when at 12 o’ clock

Check plug location when at 3 or 9 o’ clock

To drain, position a plug at 6 o’ clock

______________________________________________________________ A6474X320 VLSV/00 5.67


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Tailpiece steering cylinder............................................5

8min
pages 203-210

Troubleshooting.................................................................5

1min
page 211

Tilt cylinder ...................................................................5

1min
pages 197-198

Lift cylinder ...................................................................5

2min
pages 199-200

Tailpiece tilt cylinder.....................................................5

1min
pages 201-202

Roof cylinder ................................................................5

1min
pages 193-194

Foot cylinder.................................................................5

2min
pages 195-196

Breaker bit removal......................................................5

1min
page 188

Tailpiece installation.....................................................5

5min
pages 189-192

Conveyor power unit ....................................................5

6min
pages 181-187

Crawler track ...............................................................5

3min
pages 162-164

Crawler assembly ........................................................5

9min
pages 165-172

Breaker shaft and breaker power unit .........................5

9min
pages 173-180

Tail shaft ......................................................................5

5min
pages 154-158

Head shaft sprockets .................................................... 5

4min
pages 151-153

Flow control valve adjustment....................................... 5

2min
pages 145-146

Dual relief valve manifold adjustment ........................... 5

3min
pages 140-142

Secondary valve bank adjustment................................ 5

1min
pages 143-144

Hydrostatic pump charge pressure adjustment.............5

5min
pages 135-137

Hydrostatic pump relief valve adjustment......................5

1min
pages 133-134

Under speed sensor calibration.....................................5

2min
pages 131-132

Every 3 months .............................................................5

2min
pages 115-117

Crawler track adjustment ..............................................5

2min
pages 129-130

Inspection of the feeder .....................................................5

1min
page 121

Every 6 months .............................................................5

1min
pages 119-120

Lubrication and inspection ............................................5

2min
pages 104-105

Major hydraulic components ....................................5

6min
pages 86-90

Breaker and breaker power unit assembly....................5

1min
pages 95-96

Tailpiece assembly........................................................5

1min
pages 97-98

Hydraulic system ................................................................5

1min
page 85

Conveyor ............................................................................5

1min
page 74

Infrared pump motor controls .............................................5

1min
pages 75-76

“REGULAR”mode starting procedure................................5

1min
page 71

Chapter 6: Technical data............................................. 2

5min
pages 80-84

“TRAM ONLY”mode starting procedure............................5

1min
page 72

Starter enclosure ...........................................................5

1min
page 68

Shutdown procedure ..........................................................5

1min
page 73

Electrical system.................................................................5

1min
page 77
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.