________________________________________________ Maintenance conveyor drive reducer

Change the oil in the conveyor drive reducer (Fig. 66). The reducer oil should be changed after the first 500 hours of operation and ever 2500 hours afterwards. NOTICE! It is recommended that oil be at full operating temperature before draining.  Remove the drain plug and allow the oil to completely drain.  Clean and reinstall drain plug.  Add lubricant, Spec. 100-6, as required until fluid is visible in sight glass or begins to flow from the sight glass (if removed) that is slightly below the center line of the input shaft.  When filling the reducer, allow enough time for all cavities inside the reducer to fill.  Install inspection cover. Fig. 66: Conveyor reducer Fill plug

Sight glass

Drain plug

______________________________________________________________ A6474X320 VLSV/00 5.65


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Tailpiece steering cylinder............................................5

8min
pages 203-210

Troubleshooting.................................................................5

1min
page 211

Tilt cylinder ...................................................................5

1min
pages 197-198

Lift cylinder ...................................................................5

2min
pages 199-200

Tailpiece tilt cylinder.....................................................5

1min
pages 201-202

Roof cylinder ................................................................5

1min
pages 193-194

Foot cylinder.................................................................5

2min
pages 195-196

Breaker bit removal......................................................5

1min
page 188

Tailpiece installation.....................................................5

5min
pages 189-192

Conveyor power unit ....................................................5

6min
pages 181-187

Crawler track ...............................................................5

3min
pages 162-164

Crawler assembly ........................................................5

9min
pages 165-172

Breaker shaft and breaker power unit .........................5

9min
pages 173-180

Tail shaft ......................................................................5

5min
pages 154-158

Head shaft sprockets .................................................... 5

4min
pages 151-153

Flow control valve adjustment....................................... 5

2min
pages 145-146

Dual relief valve manifold adjustment ........................... 5

3min
pages 140-142

Secondary valve bank adjustment................................ 5

1min
pages 143-144

Hydrostatic pump charge pressure adjustment.............5

5min
pages 135-137

Hydrostatic pump relief valve adjustment......................5

1min
pages 133-134

Under speed sensor calibration.....................................5

2min
pages 131-132

Every 3 months .............................................................5

2min
pages 115-117

Crawler track adjustment ..............................................5

2min
pages 129-130

Inspection of the feeder .....................................................5

1min
page 121

Every 6 months .............................................................5

1min
pages 119-120

Lubrication and inspection ............................................5

2min
pages 104-105

Major hydraulic components ....................................5

6min
pages 86-90

Breaker and breaker power unit assembly....................5

1min
pages 95-96

Tailpiece assembly........................................................5

1min
pages 97-98

Hydraulic system ................................................................5

1min
page 85

Conveyor ............................................................................5

1min
page 74

Infrared pump motor controls .............................................5

1min
pages 75-76

“REGULAR”mode starting procedure................................5

1min
page 71

Chapter 6: Technical data............................................. 2

5min
pages 80-84

“TRAM ONLY”mode starting procedure............................5

1min
page 72

Starter enclosure ...........................................................5

1min
page 68

Shutdown procedure ..........................................................5

1min
page 73

Electrical system.................................................................5

1min
page 77
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.