MEASURING& ADJUSTING PRESSURES ill
2.1 MACHINEPREPARATION A. Tools & EquipmentRequired 2 (10,000psi) PressureGauges. 1. Two700kg/cm 2 (1,500)psi) PressureGauges, 2. Two105kg/cm 2 (1,000 psi) PressureGauge. 3. One70kg/cm 4. Two1/4 X 1/4 X 1/4 PT"Tee"adaptorfittings. 5. GeneralHandor powertools to removeand replacehydraulic fittings and components.
MACHINEIN HYDRAUUC OIL CHECKPOSITION
FIGURE2.1 SK100 ~ SK330 ILLUSTRATED
NOTE It maybe necessary to modifyhandtools in order to reach certain components for adjustment.
....
6. Thermometer to readhydraulic oil temperature. 7. Specialtools for lockingTravelMotors. B, MachineSettings & Site Conditions 1. Attachment in HydraulicOil CheckPosition. at 45°Cto 550C 2. Hydraulic Oil Temperature (113°Fto 131°F). 3. KPSSModeSwitch in H-Mode. 4. ThrottleControlin "Hi-Idle" position. 5. Firm,level testingsite.
FIGURE2.2
C. MachinePreparation Procedures 1. Movethe machine to a firm, level testing area. 2. Operatethe attachmentcontrols until the machineis in the HydraulicOil Checkposition. SeeFigure 2.1. 3. Allowthe hydraulicoil to reacha temperature of 45°Cto 55°C(113°Fto 131°F). 4. Turn engine"OFF". 5. Releasehydraulictank pressureby removing capfrom pressurerelief valve anddepressing relief valvestem.SeeFigure2.2.
¯ BE EXTREMELY CAUTIOUSWHILE RELEASING HYDRAULICTANK PRESSUREOR REMOVING LINES ANDFITTINGS, VAPORS ANDOIL MAYBE EXTREMELY HOT. ¯ WEARAPPROVED SAFETYCLOTHES, SHOES, GLOVESAND HARDHAT WHENPERFORMING ANY MAINTENANCEOR TEST PROCEDURES. 6. OpenMain PumpAccess Door and removethe Test Port Plug(P3) fromOutputPort on Pilot 2 SystemGearPumpand install 105kg/cm (1,500 psi) PressureGauge.SeeFigure 2.3. 2 (10,000psi) PressureGauges 7. Install 700kg/cm into al Port on pumpP1and into a2 Port on pumpP2. SeeFigure 2.4.
FIGURE2.3 SK100 THROUGHSK160 CONFIGURATION \
SK200 THROUGHSK460 CONFIGURATION
:/. ’ .,..
FIGURE2.4