Jeep Wrangler JK Ripp SDS Instructions Manual - PDF DOWNLOAD

Page 11

RIPP Supercharger JEEP Wrangler 3.8 Step: (7) Relocate EVAP Valve (Attention Critical Step) 

This step requires you to cut the original hard plastic lines that routed to and from the recirculation valve. Then extend and move it closer to the passenger side fender to make room for the supercharger installation in the following steps.

Follow the upper and lower lines coming to and from the EVAP valve. This valve was originally removed and placed aside in step 1. Use the two 5/16” X 20” rubber lines outlined in green and yellow, these two lines are the “in and out” and attention is needed for proper relocation. Please mark the upper and lower hoses being careful not to mix them up.

 

After cutting the hoses and securing the proper routing, mount the supplied metal bracket as images above. The valve will be flipped upside down as imaged. Next route the supplied 5/16” X 20” rubber lines as imaged.

After installing the supplied lines route as follows to make maximum clearance for air filter assembly. The upper (Green line will be your vacuum and boost line for all your accessories installed in later steps). 7

Copyright RIPP Modifications LLC 2008 all rights reserved


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Jeep Wrangler JK Ripp SDS Instructions Manual - PDF DOWNLOAD by www.heydownloads.com - Issuu