OPERATING INSTRUCTIONS 6015 / RH40E Inspection and servicing Plan A - after every 250 OH (at 250, 750, 1250 ... OH)
Plan B - after every 500 OH (at 500, 1500, 2500 ... OH)
Plan C - after every 1000 OH (at 1000, 2000, 3000, 4000 ... OH)
Plan D - after every 5000 OH (at 5000, 15000, 25000 ... OH)
Plan E - after every 10000 OH (at 10000, 20000, 30000, ... OH) Page 2 of 5 Location
Servicing work
Cooling system Radiator - Check tightness - Fastening screws - Rubber bearing Cooling liquid
Inspect visually for leaks Clean
Anti-freeze Lines Hose clamps Fuel system Fuel filter Fuel prefilter Tank breather valve Water trap (optional) Air-intake system Main filter element Safety filter element Air-intake line and clean-air line Hoses Intercooler Electrical system Battery cable connections Battery
Check tightness Check condition Carry out cooling liquid (ELC) analisis (see: Operation and Maintenance Manual of the engine) Change Check Check for leaks Check tightness
Menge / No.
15
Replace Replace Clean Clean
1 1 1 1
Check / replace Replace Check for tightness and leaks
26 27
Replace Check / clean Check for tightness Check fluid level
Plan Plan Plan Plan Plan A B C D E
2
5
Cooling-liquid (ELC) replacement after 6000 OH at the latest
6
Replacement of the main filter element after one year resp. after 3 cleaning cycles.
7
Replacement of safety filter element after one year resp. after 3 cleaning cycles of the main filter element at the latest.
3-20
BA RH40E(3 725 069.00)-EN